Abstract
There is a great deal of work that must be accomplished before that first shovel of earth is turned or that first grade stake is driven into the ground. In much the same manner that a sound superstructure needs a sound foundation, so does the actual building sequence require sound preconstruction preparation.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Rights and permissions
Copyright information
© 1992 Van Nostrand Reinhold
About this chapter
Cite this chapter
Levy, S.M. (1992). Mobilization. In: The Construction Superintendent’s Handbook. Springer, Boston, MA. https://doi.org/10.1007/978-1-4684-8494-6_1
Download citation
DOI: https://doi.org/10.1007/978-1-4684-8494-6_1
Publisher Name: Springer, Boston, MA
Print ISBN: 978-1-4684-8496-0
Online ISBN: 978-1-4684-8494-6
eBook Packages: Springer Book Archive