EMC systems should be specified for all new projects which have:
  1. 1.

    More than 8,000 square feet of conditioned (heated and/or cooled) space,

     
  2. 2.

    more than 10,000 square feet of space which is heated only,

     
  3. 3.

    20 or more tons of cooling with compressors of 5-ton capacity (or more) each,

     
  4. 4.

    heating capacity in excess of 500,000 Btu/hour,

     
  5. 5.

    a need for sophisticated control of HVAC, cogeneration, or other building systems,

     
  6. 6.

    a need for remote communications to ensure building performance and efficiency, or

     
  7. 7.

    a need for enhanced control, information management or system integration functions.

     

Keywords

Building Design Building Performance Maximum Energy Efficien Terminal Block Building Performance Simulation 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Copyright information

© The Fairmont Press, Inc. 1988

Authors and Affiliations

  • F. William Payne
  • John J. McGowan

There are no affiliations available

Personalised recommendations