Nuclear Power Plants

  • Richard K. Miller
Part of the VNR Competitive Manufacturing Series book series (VNRCMS)


This chapter was authored by Taylor Moore, Feature Writer for the EPRI Journal. It was published in the November 1984 issue of the EPRI Journal, volume 9, number 9, and is reprinted with permission of the Electric Power Research Institute, Palo Alto, California.


Nuclear Power Plant Nuclear Plant Electric Power Research Institute Nuclear Regulatory Commission Nuclear Application 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.


Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Further reading

  1. 1.
    U. S. Nuclear Regulatory Commission. Evaluation of Robotic Inspection Systems at Nuclear Power Plants. Prepared by Remote Technology Corp., March 1984. NUREG/CR-37lGoogle Scholar
  2. 2.
    Automated Nuclear Plant Maintenance. Final report for RP2232-l, prepared by Battelle, Columbus Laboratories(In press).Google Scholar
  3. 2.
    E. B. Silverman, “Industrial Remote Inspection System,” and T. G.Bartholet, “Odex I - A New Class of Mobile Robotics.” In Proceedings of the Robotics and Remote Handling in Hostile Environments, National Topical Meeting. American Nuclear Society, 1984.Google Scholar

Copyright information

© Springer Science+Business Media New York 1989

Authors and Affiliations

  • Richard K. Miller

There are no affiliations available

Personalised recommendations