Licensing requirements and operating experiences during the test phase are treated for a boiling water reactor (Isar 1) and for a pressurized water reactor (Grafenrheinfeld). The most important transients considered in the licensing procedures for both plants are compared.

Characteristic transients within the test phase of Isar 1 are treated in more detail (plant parameters, measurement equipment). For licensing procedures now many codes are available and a lot of experience is gained. The plant tests showed, that boundary values had not been exceeded. The large experience with plant tests could help to reduce these tests for future plants.

Keywords

License Requirement Electrical Power Supply Secondary Circuit Pressure Relief Valve Boiling Water Reactor 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Copyright information

© Springer Science+Business Media New York 1984

Authors and Affiliations

  • Dieter Brosche
    • 1
  1. 1.Bayernwerk AGMünchenFederal Republic of Germany

Personalised recommendations