Stationary Ceramic Component Considerations for Advanced Industrial Turbines

  • R. J. Bratton
  • K. L. Rieke
Part of the Army Materials Technology Conference Series book series (volume 1)

Abstract

Industry and government in the United States are working together to achieve several specific goals to improve industrial combustion turbine technology. The major goals are improved system reliability, increased fuel flexibility, reduced emission, higher operating efficiencies, and decreased equipment cost. Achievement of these goals will provide the opportunity for wide-scale use of combustion turbine engines in combined cycle power generating systems operating on coal-derived fuels (gaseous and liquid). These highly efficient combined cycle plants can be advantageously applied to base load or intermediate load duty. In addition, the combustion turbine systems alone can continue to serve peak load duty in the simple cycle mode.

Keywords

Combine Cycle Combustion System Turbine Inlet Ceramic Component Turbine Inlet Temperature 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. 1.
    D. T. Beecher et al, “Energy Conversion Alternative Study — ECAS-Westinghouse Phase I Final Report,” NASA CR 134941, February 1976.Google Scholar
  2. 2.
    D. T. Beecher et al, “Energy Conversion Alternative Study — ECAS-Westinghouse Phase II Final Report,” NASA CR 134941, March 1977.Google Scholar
  3. 3.
    Final Report, Concept Feasibility Study of Ceramics for Use in Electric Utility Gas Turbines Fired with Coal Derived Fuels, by Committee on the Use of Ceramics in Industrial Gas Turbines, University of Pittsburgh, Pittsburgh, PA 15260, Report SETEC DO 76 - 024F, October 1976.Google Scholar
  4. 4.
    R. J. Bratton and D. G. Miller, “Brittle Material Design, High Temperature Gas Turbine, Volume I,” Final Report on Contract DAAG-46-71-C-0162, AMMRC CTR 76–32, December 1976.Google Scholar
  5. 5.
    R. J. Bratton, “Ceramic Turbine Components Research and Development,” Final Report Summary, EPRI Contract RP 421 - 1, March 1979.Google Scholar
  6. 6.
    K. L. Rieke, “Ceramic Technology Readiness Development Program, Phase I — Conceptual Designs and Materials Screening, Interim Report,” DOE Contract EF-77-C-01-2786, July 1978.Google Scholar
  7. 7.
    K. L. Rieke, “Ceramic Technology Readiness Development Program, Phase I — Conceptual Designs and Materials Screening, Final Report,” DOE Contract EF-77-C-0102786, March 1979 (draft not yet released).Google Scholar

Copyright information

© Plenum Press, New York 1983

Authors and Affiliations

  • R. J. Bratton
    • 1
  • K. L. Rieke
    • 2
  1. 1.Research and Development CenterWestinghouse Electric CorporationPittsburghUSA
  2. 2.Combustion Turbine Systems DivisionWestinghouse Electric CorporationConcordvilleUSA

Personalised recommendations