Dresden Unit 1 is the first privately financed nuclear power reactor to be built in the United States. Dresden 1 began commercial power operation in April, 1960. It is a General Electric designed dual-cycle boiling water reactor with a thermal power of 700 MWt and a design electrical output of 207 MWe. The primary system consists almost entirely of 304 stainless steel.

Keywords

Storage Tank Primary System Vinyl Ester Decontamination Factor Chemical Cleaning 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Copyright information

© Plenum Press, New York 1980

Authors and Affiliations

  • W. S. Lange
    • 1
  • T. L. Snyder
    • 2
  1. 1.Station Nuclear Engineering DepartmentCommonwealth Edison CompanyChicagoUSA
  2. 2.Catalytic Inc.PhiladelphiaUSA

Personalised recommendations