Abstract
The rapidly changing and highly competitive nature of today’s global markets have made manufacturing management practices an important weapon in companies’ competitive arsenal. The drive towards customer satisfaction brought by the Total Quality Management (TQM) movement has resulted in companies facing more stringent demands from their customers to reduce lead times and improve delivery performance. Customers are also demanding more customized products, resulting in a more diverse product mix than was previously the case. In addition, many production processes, such as those in electronics manufacturing, are rapidly becoming more complex as new, innovative technologies are deployed.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Adams, J., Balas, E., Zawack, D.,“The Shifting Bottleneck Procedure for Job-Shop Scheduling”Management Science34, 391–401 (1988).
Baker, K.R.Introduction to Sequencing and Scheduling, John Wiley, New York (1974).
Balas, E., Lenstra, J.K., Vazacopoulos, A., “The One Machine Problem with Delayed Precedence Constraints and Its Use in Job Shop Scheduling”Management Science41, 94–109 (1995).
Bhaskaran, K., Pinedo, M., “Dispatching”, Chapter 83 ofHandbook of Industrial Engineering, G.Salvendy(ed.), J. Wiley (1991).
Buzacott, J.A., “A Perspective on New Paradigms in Manufacturing”Journal of Manufacturing Systems14, 118–125 (1995).
Cheng, T.C.E., Gupta, M.C., “Survey of Scheduling Research Involving Due Date Determination Decisions”European Journal of Operational Research38, 156–166 (1989).
Conway, R.W., Maxwell, W.L., Miller, L.W.Theory of Scheduling, Addison-Wesley, Reading, MA (1967).
Dauzere-Peres, S., Lasserre, J.-B.An Integrated Approach in Production Planning and Scheduling, Lecture Notes in Economics and Mathematical Systems, Springer-Verlag, Berlin (1994).
Dayhoff, J.E., Atherton,R.W.,“Signature Analysis: Simulation of Inventory, Cycle Time and Throughput Tradeoffs in Wafer Fabrication”IEEE Transactions on Components Hybrids and Manufacturing Technology9, 498–507 (1986).
Elmaghraby, S.E., “Manufacturing Capacity and its Measurement: A Critical Evaluation”Computers and Operations Research18, 615–627 (1991).
Gary, K., Kempf, K., Smith, S., Uzsoy, R., “Assessing the Quality of Production Schedules”in Intelligent Scheduling Systems, Scherer, W., Brown, D. (eds.), Kluwer Academic Publishing, 129–154 (1995).
Gershwin, S.B. “Hierarchical Flow Control: A Framework for Scheduling and Planning Discrete Events in Manufacturing Systems”Proceedings of the IEEE77, 195–206 (1989).
Goldratt, E.M.The Goal: A Process of Ongoing Improvement, North RiverPress(1986).
Gong, L, Matsuo, H., “Stabilizing Work-in-Process and Smoothing Production in a Production System with Random Yield”, Research Report, Graduate School of Business, University of Texas at Austin, (1990).
McKay, K.N., Buzacott, J.A., Safayeni, F.R., “The Scheduler’s Knowledge of Uncertainty: The Missing Link”in Knowledge Based Production Management Systems, Elsevier Science Publishers B.V. (1989).
Mehta, S.V., Uzsoy, R., “Predictable Scheduling of a Single Machine Subject to Breakdowns”, Research Report, School of Industrial Engineering, Purdue University, West Lafayette, IN (1995).
Mehta, S.V., Uzsoy, R., “Predictable Scheduling of a Job Shop Environment Subject to Breakdowns”, Research Report, School of Industrial Engineering, Purdue University, West Lafayette, IN (1996).
Morton, T.E., Pentico, D.Heuristic Scheduling Systems with Application to Project Scheduling, John Wiley, New York (1993).
Pinedo, M.Scheduling: Theory Algorithms and Systems, Prentice Hall, New York (1995).
Potts, C.N., van Wassenhove, LN., “Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity”Journal of the Operational Research Society43, 395–406 (1992).
Ragatz, G.L, Mabert, V.A., “An Evaluation of Order Release Mechanisms in a Job Shop Environment”Decision Sciences19, 167–189 (1988).
Smith, S.F., “Knowledge-Based Production Management: Approaches, Results and Prospects”, Center for Integrated Manufacturing Decision Systems, The Robotics Institute, Carnegie-Mellon University, Pittsburgh, PA 15213 (1991).
Stalk, G., Hout, T.M.Competing Against Time, The Free Press, New York (1990).
Sugimori, Y., Kusunoki, K., Cho, F., Uchikawa, S., “Toyota Production System and Kanban System: materialization of Just-in-Time and Respect-for-Human System”International Journal of Production Research15, 553–564 (1977).
Vollmann, T.E., Berry, W.L., Whybark, D.C.Manufacturing Planning and Control Systems, Irwin, Homewood, IL (1988).
Zweben, M., Fox, M.S.Intelligent Scheduling, Morgan Kaufman, San Francisco (1994).
Author information
Authors and Affiliations
Rights and permissions
Copyright information
© 1997 Springer Science+Business Media New York
About this chapter
Cite this chapter
Ovacik, I.M., Uzsoy, R. (1997). Introduction. In: Decomposition Methods for Complex Factory Scheduling Problems. Springer, Boston, MA. https://doi.org/10.1007/978-1-4615-6329-7_1
Download citation
DOI: https://doi.org/10.1007/978-1-4615-6329-7_1
Publisher Name: Springer, Boston, MA
Print ISBN: 978-1-4613-7906-5
Online ISBN: 978-1-4615-6329-7
eBook Packages: Springer Book Archive