Skip to main content
  • 116 Accesses

Abstract

The rapidly changing and highly competitive nature of today’s global markets have made manufacturing management practices an important weapon in companies’ competitive arsenal. The drive towards customer satisfaction brought by the Total Quality Management (TQM) movement has resulted in companies facing more stringent demands from their customers to reduce lead times and improve delivery performance. Customers are also demanding more customized products, resulting in a more diverse product mix than was previously the case. In addition, many production processes, such as those in electronics manufacturing, are rapidly becoming more complex as new, innovative technologies are deployed.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 109.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  • Adams, J., Balas, E., Zawack, D.,“The Shifting Bottleneck Procedure for Job-Shop Scheduling”Management Science34, 391–401 (1988).

    Article  Google Scholar 

  • Baker, K.R.Introduction to Sequencing and Scheduling, John Wiley, New York (1974).

    Google Scholar 

  • Balas, E., Lenstra, J.K., Vazacopoulos, A., “The One Machine Problem with Delayed Precedence Constraints and Its Use in Job Shop Scheduling”Management Science41, 94–109 (1995).

    Article  Google Scholar 

  • Bhaskaran, K., Pinedo, M., “Dispatching”, Chapter 83 ofHandbook of Industrial Engineering, G.Salvendy(ed.), J. Wiley (1991).

    Google Scholar 

  • Buzacott, J.A., “A Perspective on New Paradigms in Manufacturing”Journal of Manufacturing Systems14, 118–125 (1995).

    Article  Google Scholar 

  • Cheng, T.C.E., Gupta, M.C., “Survey of Scheduling Research Involving Due Date Determination Decisions”European Journal of Operational Research38, 156–166 (1989).

    Article  Google Scholar 

  • Conway, R.W., Maxwell, W.L., Miller, L.W.Theory of Scheduling, Addison-Wesley, Reading, MA (1967).

    Google Scholar 

  • Dauzere-Peres, S., Lasserre, J.-B.An Integrated Approach in Production Planning and Scheduling, Lecture Notes in Economics and Mathematical Systems, Springer-Verlag, Berlin (1994).

    Book  Google Scholar 

  • Dayhoff, J.E., Atherton,R.W.,“Signature Analysis: Simulation of Inventory, Cycle Time and Throughput Tradeoffs in Wafer Fabrication”IEEE Transactions on Components Hybrids and Manufacturing Technology9, 498–507 (1986).

    Article  Google Scholar 

  • Elmaghraby, S.E., “Manufacturing Capacity and its Measurement: A Critical Evaluation”Computers and Operations Research18, 615–627 (1991).

    Article  Google Scholar 

  • Gary, K., Kempf, K., Smith, S., Uzsoy, R., “Assessing the Quality of Production Schedules”in Intelligent Scheduling Systems, Scherer, W., Brown, D. (eds.), Kluwer Academic Publishing, 129–154 (1995).

    Google Scholar 

  • Gershwin, S.B. “Hierarchical Flow Control: A Framework for Scheduling and Planning Discrete Events in Manufacturing Systems”Proceedings of the IEEE77, 195–206 (1989).

    Article  Google Scholar 

  • Goldratt, E.M.The Goal: A Process of Ongoing Improvement, North RiverPress(1986).

    Google Scholar 

  • Gong, L, Matsuo, H., “Stabilizing Work-in-Process and Smoothing Production in a Production System with Random Yield”, Research Report, Graduate School of Business, University of Texas at Austin, (1990).

    Google Scholar 

  • McKay, K.N., Buzacott, J.A., Safayeni, F.R., “The Scheduler’s Knowledge of Uncertainty: The Missing Link”in Knowledge Based Production Management Systems, Elsevier Science Publishers B.V. (1989).

    Google Scholar 

  • Mehta, S.V., Uzsoy, R., “Predictable Scheduling of a Single Machine Subject to Breakdowns”, Research Report, School of Industrial Engineering, Purdue University, West Lafayette, IN (1995).

    Google Scholar 

  • Mehta, S.V., Uzsoy, R., “Predictable Scheduling of a Job Shop Environment Subject to Breakdowns”, Research Report, School of Industrial Engineering, Purdue University, West Lafayette, IN (1996).

    Google Scholar 

  • Morton, T.E., Pentico, D.Heuristic Scheduling Systems with Application to Project Scheduling, John Wiley, New York (1993).

    Google Scholar 

  • Pinedo, M.Scheduling: Theory Algorithms and Systems, Prentice Hall, New York (1995).

    Google Scholar 

  • Potts, C.N., van Wassenhove, LN., “Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity”Journal of the Operational Research Society43, 395–406 (1992).

    Google Scholar 

  • Ragatz, G.L, Mabert, V.A., “An Evaluation of Order Release Mechanisms in a Job Shop Environment”Decision Sciences19, 167–189 (1988).

    Article  Google Scholar 

  • Smith, S.F., “Knowledge-Based Production Management: Approaches, Results and Prospects”, Center for Integrated Manufacturing Decision Systems, The Robotics Institute, Carnegie-Mellon University, Pittsburgh, PA 15213 (1991).

    Google Scholar 

  • Stalk, G., Hout, T.M.Competing Against Time, The Free Press, New York (1990).

    Google Scholar 

  • Sugimori, Y., Kusunoki, K., Cho, F., Uchikawa, S., “Toyota Production System and Kanban System: materialization of Just-in-Time and Respect-for-Human System”International Journal of Production Research15, 553–564 (1977).

    Article  Google Scholar 

  • Vollmann, T.E., Berry, W.L., Whybark, D.C.Manufacturing Planning and Control Systems, Irwin, Homewood, IL (1988).

    Google Scholar 

  • Zweben, M., Fox, M.S.Intelligent Scheduling, Morgan Kaufman, San Francisco (1994).

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 1997 Springer Science+Business Media New York

About this chapter

Cite this chapter

Ovacik, I.M., Uzsoy, R. (1997). Introduction. In: Decomposition Methods for Complex Factory Scheduling Problems. Springer, Boston, MA. https://doi.org/10.1007/978-1-4615-6329-7_1

Download citation

  • DOI: https://doi.org/10.1007/978-1-4615-6329-7_1

  • Publisher Name: Springer, Boston, MA

  • Print ISBN: 978-1-4613-7906-5

  • Online ISBN: 978-1-4615-6329-7

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics