Advertisement

Abstract

Legacy data migration can be optimally performed if a structured sequential flow is applied. The flow will have the steps of the sequence detailed in subsequent chapters. A flow chart of the methodology, overview of the flow and background on each of the steps is the basis of this chapter.

Keywords

Target Process Physical Design Design Validation Migration Task Structure Methodology 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Copyright information

© Springer Science+Business Media New York 2003

Authors and Affiliations

  • Pallab Chatterjee
    • 1
  1. 1.SiliconMap, LLC P&D Engineering Consultants, Inc.LivermoreUSA

Personalised recommendations