Abstract

Recent years have seen increasing efforts to incorporate risk and uncertainty into optimal and heuristic methods for mine planning and scheduling. The recent volatility in the prices of metals and minerals has provided further impetus for developing new methods that facilitate integrated optimization and risk analysis in mining. We consider a long-term problem of determining a plan for above- and underground mining, allowing for different ways in which the material can be extracted, such as choice of cutoff grade and mining speed. We develop a methodology based on a longest-path network framework that allows us to identify the mining plans that produce the k highest values of expected profit, where k can be chosen by the decision-maker. We couple this with a methodology for evaluating each of these plans with respect to various measures of risk, such as variance, probability of achieving a profit target, or conditional value-at-risk. The framework is easily extendible to other risk measures. The methodology provides a means to construct a set of Pareto-optimal solutions with expected profit and the selected risk measure as the two performance metrics. We illustrate our approach using a simple example in which the risk measure is value-at-risk (VaR).

Keywords

Surface mining Underground mining Planning and scheduling Longest path network Risk Value-at-risk 

Notes

Acknowledgement

This research was undertaken while the first author was a graduate student at the University of California, Berkeley. The first author gratefully acknowledges support from a fellowship from the National Sciences and Engineering Research Council of Canada.

References

  1. Abdel Sabour, S.A., & Poulin, R. 2010. Mine expansion decisions under uncertainty. International Journal of Mining, Reclamation and Environment, 24(4), 340–349.Google Scholar
  2. Boland, N., Dumitrescu, I.,\& Froyland, G.. 2008. A multistage stochastic programming approach to open pit mine production scheduling with uncertain geology. Working paper, School of Mathematics and Physical Sciences, Australia: University of NewcastleGoogle Scholar
  3. Chen, J., Gu, D., & Li, J. 2003. Optimization principle of combined surface and underground mining and its applications. Journal of the Central South University of Technology (China), 10(3), 222–225.Google Scholar
  4. Chicoisne, R., Espinosa, M., Goycoolea, M., Moreno, E., & Rubio,E. 2011. A new algorithm for the open-pit mine scheduling problem. Operations Research, 60(1), 4–17.Google Scholar
  5. Chiles, J.-P., & Delfiner, P. 2012. Geostatistics: Modeling spatial uncertainty, Second edition New York: Wiley Interscience.Google Scholar
  6. Denby, B., & Schofield, D. 1995. Inclusion of risk assessment in open-pit design and scheduling. Transactions of the Institution of Mining and Metallurgy. Section A: Mining Industry. 104, A67–A71.Google Scholar
  7. de Lara, M., Morales, N., & Beeker N. 2013. Adaptive strategies for the open-pit mine optimal scheduling problem. Working paper, Centre d’Enseignement et de Recherche en Mathematiques et Calcul Scientifique. France: Universite Paris-Est.Google Scholar
  8. Deutsch, C. V., & Journel, A.G. 1998. GSLIB: Geostatistical software library and user’s guide, Second edition. New York: Oxford University Press.Google Scholar
  9. Dimitrakoupoulos, R. 1998. Conditional simulation algorithms for modeling orebody uncertainty in open pit mines. International Journal of Surface Mining, Reclamation and Environment, 12, 173–179.Google Scholar
  10. Dimitrakoupoulos, R., Martinez, L., & Ramazan S. 2007. Maximum upside / minimum downside approach to the traditional optimization of open pit mine designs. Journal of Mining Science, 43 (1), 73–82.Google Scholar
  11. Dimitrakoupolos, R. 2011. Strategic mine planning under uncertainty. Journal of Mining Science, 47(2), 138–150.Google Scholar
  12. Epstein, R., Goic, M., Weintraub, A., Catalan, J., Santibanez, P., Urrutia, R., Cancino, R., Gaete, S., Aguayo, A.,& Caro, F. 2010. Optimizing long-term production plans in underground and open pit copper mines. Operations Research 60(1), 4–17.Google Scholar
  13. Golamnejad, J., Osanloo, M., & Karimi, B. 2006. A chance-constrained programming approach for open pit long-term production scheduling in stochastic environments. The Journal of the South African Institute of Mining and Metallurgy 106, 105–114.Google Scholar
  14. Hershberger, J., Maxel, M., & Suri, S. 2007. Finding the k shortest simple paths: A new algorithm and its implementation. ACM Transactions on Algorithms, 3(4), 1–9.Google Scholar
  15. Hustrulid, W.A. & Bullock, R.L. (eds). 2001. Underground mining methods: Engineering fundamentals and international case studies. Littleton, Colorado: Society for Mining, Metallurgy and Exploration.Google Scholar
  16. Kumral, M. 2010. Robust stochastic mine production scheduling. Engineering Optimization, 42(6), 567–579.Google Scholar
  17. Lemelin, B., Abdel Sabour, S.A., & Poulin, R. 2006. Valuing Mine 2 at Raglan using real options. International Journal of Mining, Reclamation and Environment, 20(1), 46–56.Google Scholar
  18. Martinez, L.A. 2006. Strategic coal mining planning project using an integrated real options model approach. Proceedings of the Bowen Basin Symposium, McKay, Queensland, Australia, October 6–8, 2010.Google Scholar
  19. Newman, A.M., Rubio, E., Caro, R., Weintraub A., & Eurek, K. 2010. A review of operations research in mine planning. Interfaces, 40(3), 222–246.Google Scholar
  20. Newman, A.M., Yano, C.A., & Rubio, R. 2013. Mining above and below ground: Timing the transition. IIE Transactions 45 (8), 865–882.Google Scholar
  21. Osanloo, M., Golamnejad, J., & Karimi B. 2007. Long-term open pit mine production planning: a review of models and algorithms. International Journal of Mining, Reclamation and Environment, 22(1), 1–33.Google Scholar
  22. Ravenscroft, P.J. 1992. Risk analysis for mine scheduling by conditional simulation. Transactions of the Institution of Mining and Metallurgy Section A: Mining Industry 101, A104–A108.Google Scholar
  23. Sarin, R., & West-Hansen, J. 2005. The long-term mine production scheduling problem. IIE Transactions, 37(2), 109–121.Google Scholar
  24. Stacey, T.R., & Terbrugge,P.J. 2000. Open pit to underground–transition and interaction. Proceedings of the MassMin 2000 Conference, Brisbane, Queensland, Australia, 29 October–2 November 2000, 97–104Google Scholar
  25. Topuz, E., & Duan, C. 1989. A survey of operations research applications in the mining industry. CIM Bulletin, 82(925), 48–50.Google Scholar
  26. Visser, W.F., & Ding, B.2007. Optimization of the transition from open pit to underground mining. Proceedings of the International Mining Symposia 2007, Aachen University, Aachen, Germany, 30–31 May 2007, 131–148Google Scholar
  27. Yen, J.Y. 1971. Finding the k shortest loopless paths in a network. Management Science, 17(11), 712–716.Google Scholar

Copyright information

© Springer Science+Business Media New York 2014

Authors and Affiliations

  1. 1.Haas School of Business and IEOR DepartmentThe University of California - BerkeleyBerkeleyUSA
  2. 2.Watarah AdvisorsTorontoCanada

Personalised recommendations