Abstract

When Ford W. Harris published his short three-page article developing the Economic Order Quantity (EOQ) model in 1913, he likely did not foresee that it would still be discussed and used 100 years later. Harris’ EOQ model was one of the first applications of mathematical modeling to guide managers in making business decisions, and it has spawned thousands of related studies over the past century that have built on its major foundations and insights. In this chapter we present a short history of the EOQ model by discussing the model itself, some practical issues about implementing the model, and major extensions to the basic model grouped by the dominant foci of each subsequent decade.

Keywords

Entropy Transportation Line Production Rosen Dispatch 

References

  1. Alinovi A, Bottani E, Montanari R (2012) Reverse logistics: A stochastic EOQ-based inventory control model for mixed manufacturing/remanufacturing systems with return policies. International Journal of Production Research 50(5):1243-1264Google Scholar
  2. Aucamp DC (1984) A solution to the multiple set-up problem. International Journal of Production Research 22(4):549-554Google Scholar
  3. Axsäter S (1980) Economic order quantities and variations in production load. International Journal of Production Research 18(3):359-365Google Scholar
  4. Axsäter S (1981) Economic order quantities and variations in production load: Interpretation of capacity costs for regular capacity and overtime. International Journal of Production Research 19(4):439-449Google Scholar
  5. Bahl HC, Zionts S (1986) Lot sizing as a fixed-charge problem. Production and Inventory Management 27(1):1-10Google Scholar
  6. Baker RC, Chang R, Chang I (1994) Switching rules for JIT purchasing. Production and Inventory Management Journal 35(3):13-17Google Scholar
  7. Balakrishnan A, Pangburn MS, Stavrulaki E (2004) “Stack Them High, Let ‘em Fly”: Lot-sizing policies when inventories stimulate demand. Management Science 50(5):630-644Google Scholar
  8. Banks J, Hohenstein CL (1981) Simplification of the Economic Order Quantity equation. Journal of Purchasing and Materials Management 17(2):19-22Google Scholar
  9. Bassin WM (1990) A technique for applying EOQ models to retail cycle stock inventories. Journal of Small Business Management 28(1):48-55Google Scholar
  10. Battini D, Grassi A, Persona A, Sgarbossa F (2010) Consignment stock inventory policy: methodological framework and model. International Journal of Production Research 48(7):2055-2079Google Scholar
  11. Bechtold SE, Nast DA (1978) A comparison of two inventory decision models. Journal of Management 4(1):85-95Google Scholar
  12. Bhargava HK, Daewon S, Xu SH (2006) Stockout compensation: Joint inventory and price optimization in electronic retailing. INFORMS Journal on Computing 18(2):255-266Google Scholar
  13. Bigham P (1986) Economic order quantities for systems with step-function ordering costs. Production and Inventory Management 27(4):119-127Google Scholar
  14. Bill PH, Chaouch BA (1995) An EOQ model with random variations in demand. Management Science 41(5):927-936Google Scholar
  15. Boucher TO (1984) Lot sizing in group technology production systems. International Journal of Production Research 22(1):85-93Google Scholar
  16. Bouchery Y, Ghaffari A, Jemai Z, Dallery Y (2012) Including sustainability criteria into inventory models. European Journal of Operational Research 222(2):229-240Google Scholar
  17. Bregman RL (1992) A note on optimal order quantities for credit purchases. International Journal of Production Economics 28(2):203-210Google Scholar
  18. Burnham JM, Mohanty BB (1988) Requiem for EOQ—But Unified Order Quantity is alive and well. Production and Inventory Management Journal 29(3):80-83Google Scholar
  19. Burns LD, Hall RW, Blumenfeld DE, Daganzo CF (1985) Distribution strategies that minimize transportation and inventory costs. Operations Research 33(3):469-490Google Scholar
  20. Cachon G (2001) Managing a retailer’s shelf space, inventory, and transportation. Manufacturing & Service Operations Management 3(3):211-229Google Scholar
  21. Cannon AR, Crandall RE (2004) The way things never were. APICS—The Performance Advantage 14(1):32-35Google Scholar
  22. Carlson ML, Miltenburg GJ (1996) Economic order quantity and quantity discounts under date-terms supplier credit: A discounted cash flow approach. Journal of the Operational Research Society 47(3):384-394Google Scholar
  23. Chamberlain, WW (1977) Is there an EOQ for all seasons or can we make current system more responsive? Production and Inventory Management 18(1):25-34Google Scholar
  24. Chan CK, Lee YCE (2012) A co-ordination model combining incentive scheme and co-ordination policy for a single-vendor-multi-buyer-supply chain. International Journal of Production Economics 135(1):136-143Google Scholar
  25. Chan CK, Lee YCE, Goyal SK (2010) A delayed payment method in co-ordinating a single-vendor multi-buyer supply chain. International Journal of Production Economics 127(1): 95-102Google Scholar
  26. Chen C, Min KJ (1995) Optimal inventory and disposal policies in response to a sale. International Journal of Production Economics 42(1):17-27Google Scholar
  27. Cheng TCE (1990) An EOQ model with pricing consideration. Computers and Industrial Engineering 18(4):529-534Google Scholar
  28. Chiou C-C, Yao, M-J, Tsai, J (2007) A mutually beneficial coordination mechanism for a one-supplier multi-retailers supply chain. International Journal of Production Economics 108(1/2):314-328Google Scholar
  29. Chiu HN, Chen HM (1997) The effect of time-value of money on discrete time varying demand lot-sizing models with learning and forgetting considerations. Engineering Economist 42(3):203-221Google Scholar
  30. Choi H, Malstrom EM, Classen RJ (1984) Computer simulation of lot-sizing algorithms in three-stage multi-echelon inventory systems. Journal of Operations Management 4(3):259-277Google Scholar
  31. Chung K (1998) A theorem on the determination of economic order quantity under conditions of permissible delay in payments. Computers and Operations Research 25(1):49-52Google Scholar
  32. Chung K-J, Cárdenas-Barrón LE (2012) The complete solution procedure for the EOQ and EPQ inventory models with linear and fixed backorder costs. Mathematical and Computer Modellling 55(11-12):2151-2156Google Scholar
  33. Chyr F, Tsong ML, Chin-Fu Ho (1990a) Comparison between Just-In-Time and EOQ system. Engineering Costs & Production Economics 18(3):233-240Google Scholar
  34. Chyr F, Tsong ML, Chin-Fu Ho (1990b) An extension of the EOQ production model based on damage costs. International Journal of Operations and Production Management 10(5):71-76Google Scholar
  35. Clarke HR (1987) Economic order quantities with discounting. Engineering Costs and Production Economics 11(4):215-221Google Scholar
  36. Cobbaert K, van Oudheusden D (1996) Inventory models for fast moving spare parts subject to “sudden death” obsolescence. International Journal of Production Economics 44(3):239-248Google Scholar
  37. Crowther JF (1964) Rationale for quantity discounts. Harvard Business Review 42(2): 121-127Google Scholar
  38. Das C (1984) A unified approach to the price-break Economic Order Quantity (EOQ) problem. Decision Sciences 15(3):350-358Google Scholar
  39. Diegel A (1966) A linear approach to the dynamic inventory problem. Management Science 12(7): 530-540Google Scholar
  40. Dobos I, Richter K (2000) The integer EOQ repair and waste disposal model – further analysis. Central European Journal of Operations Research 8(2):173-194Google Scholar
  41. Dobos I, Richter K (2003) A production/recycling model with stationary demand and return rates. Central European Journal of Operations Research 11(1):35-46Google Scholar
  42. Dobos I, Richter K (2004) An extended production/recycling model with stationary demand and return rates. International Journal of Production Economics 90(3):311-323Google Scholar
  43. Dobos I, Richter K (2006) A production/recycling model with quality consideration. International Journal of Production Economics 104(2):571-579Google Scholar
  44. Drezner Z, Gurnani H (1995) An EOQ model with substitutions between products. Journal of the Operational Research Society 46(7):887-891Google Scholar
  45. Dyl EA, Keaveny TJ (1983) Cost Minimization in Staffing. Human Resource Planning 6(2):103-114Google Scholar
  46. El Saadany AMA, Jaber MY (2008) The EOQ repair and waste disposal model with switching costs. Computers and Industrial Engineering 55(1):219-233Google Scholar
  47. Elsayed EA, Teresi C (1983) Analysis of Inventory systems with deteriorating items. International Journal of Production Research 21(4): 449-460Google Scholar
  48. Fazel F (1997) A comparative analysis of inventory costs of JIT and EOQ purchasing. International Journal of Physical Distribution and Logistics Management 27(7/8):496-504Google Scholar
  49. Fazel F, Fischer KP, Gilbert EW (1998) JIT Purchasing vs. EOQ with a price discount: An analytical comparison of inventory costs. International Journal of Production Economics 54(1):101-109Google Scholar
  50. Ferguson M, Jayaraman V, Souza GC (2007) Note: An application of the EOQ model with nonlinear holding cost to inventory management of perishables. European Journal of Operational Research 180(1): 485-490Google Scholar
  51. Fox RE (1984) Main Bottleneck on the factory floor? Management Review 73(11):55-61Google Scholar
  52. Fujiwara O, Perera ULJSR (1993) EOQ models for continuously deteriorating products using linear and exponential penalty costs. European Journal of Operational Research 70(1):104-114Google Scholar
  53. Fulbright JE (1979) Advantages and disadvantages of the EOQ model. Journal of Purchasing and Materials Management 15(1):8-10Google Scholar
  54. Gleason JM (1971) A Computational Variation of the Wagner-Whitin Algorithm: An Alternative to the E.O.Q. Production and Inventory Management 12(1):15-22Google Scholar
  55. Gou Q, Liang L, Huang Z, Xu C (2008) A joint inventory model for an open-loop reverse supply chain. International Journal of Production Economics 116(1):28-42Google Scholar
  56. Goyal SK, Evans AG (1981) A Note on ‘Economic order quantities and variations in production load by S. Axsäter.’ International Journal of Production Research 19(4):437-438Google Scholar
  57. Grant MR (1993) EOQ and Price Break Analysis in a JIT Environment. Production and Inventory Management Journal 34(3):64-69Google Scholar
  58. Gupta OK (1988) An Improved Procedure for Economic Order Quantity with All-Unit Price Discounts. International Journal of Operations and Production Management 8(4):79-83Google Scholar
  59. Gupta SM, Brennan L (1992) Lot Sizing and Backordering in Multi-Level Product Structures. Production and Inventory Management 33(1):27-35Google Scholar
  60. Gurnani C (1983) Economic analysis of inventory systems. International Journal of Production Research 21(2):261-277Google Scholar
  61. Ha D, Kim S (1995) Optimal contract quantity versus optimal shipping quantity. Production and Inventory Management Journal 36(4):79-80Google Scholar
  62. Hariga M, Haouari M (1999) An EOQ lot sizing model with random supplier capacity. International Journal of Production Economies 58(1):39-47Google Scholar
  63. Harris FW (1913) How many parts to make at once. Factory, The Magazine of Management 10(2):135-136, 152Google Scholar
  64. Herron, D (1967) Inventory management for minimum cost. Management Science 14(4):B219-B235Google Scholar
  65. Ho C-J (1993) Evaluating lot-sizing performance in multi-level MRP systems: A comparative analysis of multiple performance measures. International Journal of Operations and Production Management 13(11):52-79Google Scholar
  66. Hoffmann TR (1969) EOQs for aggregate inventory management. Production and Inventory Management 10(3):71-77Google Scholar
  67. Hsu J-T, Hsu L-F (2013) An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns. International Journal of Production Economics 143(1):162-170 Google Scholar
  68. Hwang H (1999) Inventory models for both deteriorating and ameliorating items. Computers and Industrial Engineering 37(1/2);257-260Google Scholar
  69. Jaber MY, Rosen MA (2008) The economic order quantity repair and waste disposal model with entropy cost. European Journal of Operational Research 188(1):109-120Google Scholar
  70. Jain K, Nagar L, Srivastava V (2006) Benefit sharing in inter-organizational coordination. Supply Chain Management: An International Journal 11(5):400-406Google Scholar
  71. Kaimann, R (1968a) A fallacy of ‘E.O.Q.ING.’ Production and Inventory Management 9(1): 82-87Google Scholar
  72. Kaimann, R (1968b) Revisiting a fallacy of ‘E.O.Q. ING,’ Production and Inventory Management 9(4):12-19Google Scholar
  73. Kaimann, R (1969) E.O.Q. revisited. Journal of Purchasing 5(2):62-72Google Scholar
  74. Kaimann, R (1970) Choosing between E.O.Q. and dynamic programming for purchasing. Journal of Purchasing 6(1): 44-51Google Scholar
  75. Kaimann, R (1972) A comparison of the EOQ and dynamic programming inventory models with safety tock considerations. Production and Inventory Management 13(3):72-88Google Scholar
  76. Kanet JJ, Miles JA (1985) Economic order quantities and inflation. International Journal of Production Research 23(3):597-608Google Scholar
  77. Khan M, Jaber MY, Wahab MIM (2010) Economic order quantity for items with imperfect quality with learning in inspection. International Journal of Production Economics 124(1):87-96Google Scholar
  78. Khan M, Jaber MY, Guiffrida AL, Zolfaghari S (2011) A review of the extensions of a modified EOQ model for imperfect quality items. International Journal of Production Economics 132(1): 1-12Google Scholar
  79. Khouja M, Lamb RP (1999) An optimal schedule for dollar cost averaging under different transaction costs. International Transactions in Operational Research 6(2):245-261Google Scholar
  80. Kropp, DH, Carlson RC, Jucker JV (1979) Use of dynamic lot-sizing to avoid nervousness in Material Requirements Planning systems. Production and Inventory Management 20(3):49-58Google Scholar
  81. Kuzdrall PJ, Britney RR (1982) Total setup lot sizing with quantity discounts. Decision Sciences 13:101-112Google Scholar
  82. Lau RSM, Xie J, Zhao X (2008) Effects of inventory policy on supply chain performance: A simulation study of critical decision parameters. Computers and Industrial Engineering 55(3):620-633Google Scholar
  83. Landeros R, Lyth DM (1989) Economic lot size models for cooperative inter-organizational relationships. Journal of Business Logistics 10(2):146-158Google Scholar
  84. Langley CJ (1976) Determination of the Economic Order Quantity under the condition of uncertainty. Transportation Journal 16(1):85-92Google Scholar
  85. Lee HL, Rosenblatt MJ (1986) The effects of varying marketing policies and conditions on the economic order quantity. International Journal of Production Research 24(3):593-598Google Scholar
  86. Lev B, Weiss HJ (1990) Inventory models with cost changes. Operations Research 38(1):53-63Google Scholar
  87. Li J, Cheng TCE, Wang S (2007) Analysis of postponement strategy for perishable items by EOQ-based models. International Journal of Production Economics 107(1):31-38Google Scholar
  88. Liberatore MJ (1979) The EOQ model under stochastic lead time. Operations Research 27(2):391-396Google Scholar
  89. Lim W, Ou J, Chung-Paw T (2003) Inventory cost effect of consolidating several one-warehouse multiretailer systems. Operations Research 51(4):668-672Google Scholar
  90. Lippman, SA (1971) Economic order quantities and multiple set-up costs. Management Science 18(1):39-47Google Scholar
  91. Maddah B, Jaber MY (2008) Economic order quantity for items with imperfect quality: Revisited. International Journal of Production Economics 112(2):808-815Google Scholar
  92. Markowski E (1986) EOQ modification for future price increases. Journal of Purchasing and Materials Management 22(3):28-32Google Scholar
  93. Meller RD (1995) The impact of multiple stocking points on system profitability. International Journal of Production Economics 38(2/3):209-214Google Scholar
  94. Melnyk SA, Piper CJ (1985) Leadtime errors in MRP: The lot-sizing effect. International Journal of Production Research 23(2):253-264Google Scholar
  95. Minner S (2007) A note on how to compute economic order quantity without derivatives by cost comparisons. International Journal of Production Economics 92:197-200Google Scholar
  96. Miranda PA, Garrido RA (2004) Incorporating inventory control decisions into a strategic distribution network design model with stochastic demand. Transportation Research: Part E 40(3):183-207Google Scholar
  97. Moore, JR (1971) Forecasting and scheduling for past-model replacement parts. Management Science 18(4):B-200-B213Google Scholar
  98. Nagarajan M, Rajagopalan S (2008) Contracting under vendor managed inventory systems using holding cost subsidies. Production and Operations Management 17(2):200-210Google Scholar
  99. Ng CT, Cheng TCE, Kotov V, Kovalyov MY (2009) The EOQ problem with decidable warehouse capacity: Analysis, solution approaches and applications. Discrete Applied Mathematics 157(8): 1806-1824Google Scholar
  100. Patterson J, LaForge RL (1985) The incremental part-period algorithm: An alternative to EOQ. Journal of Purchasing and Materials Management 21(2):28-33Google Scholar
  101. Pentico DW, Drake MJ (2011) A survey of deterministic models for the EOQ and EPQ with partial backordering. European Journal of Operational Research 214(2):179-198Google Scholar
  102. Philips, JD, Dawson, LF (1968) Bayesian statistics in retail inventory management. Journal of Retailing 44(2):27-34Google Scholar
  103. Philippakis, AS (1970) The cost of using EOQ with variable demand items. Journal of Purchasing 6(4):65-73Google Scholar
  104. Porteus EL (1990) The impact of inspection delay on process and inspection lot Sizing. Management Science 36(8):999-1007Google Scholar
  105. Ptak CA (1988) A comparison of inventory models and carrying costs. Production and Inventory Management Journal 29(4):1-3Google Scholar
  106. Pullin J (1995) Just in time for whom? Management Services 39(4):14-15Google Scholar
  107. Ram Mohan RV (1978) EOQ and increasing variable inventory carrying costs. Industrial Management 20(6):13-16Google Scholar
  108. Rao SS, Bahari-Kashani H (1990) Economic Order Quantity and storage size – Some considerations. Engineering Costs and Production Economics 19(1-3):201-204Google Scholar
  109. Replogle SH (1988) The strategic use of smaller lot sizes through a new EOQ model. Production and Inventory Management Journal 29(3):41-44Google Scholar
  110. Richter K (1996) The extended EOQ repair and waste disposal model. International Journal of Production Economics 45:443-447Google Scholar
  111. Richter K, Dobos I (1999) Analysis of the EOQ repair and waste disposal problem with integer setup numbers. International Journal of Production Economics 59(1-3):463-467Google Scholar
  112. Ritchie E, Tsado A (1986) The penalties of using the EOQ: A comparison of lot-sizing Rules for linear increasing demand. Production and Inventory Management 27(1):12-18Google Scholar
  113. Rubin PA, Dilts DM, Barron BA (1983) Economic Order Quantities with quantity discounts: Grandma does it best. Decision Sciences 14(2):270-281 27Google Scholar
  114. Russell RM, Krajewski LJ (1991) Optimal purchase and transportation cost lot sizing for a Single Item. Decision Sciences 22(4):940-952Google Scholar
  115. Salameh MK, Jaber MY (2000) Economic production quantity model for items with imperfect quality. International Journal of Production Economics 64(1-3):59-64Google Scholar
  116. Schrady DA (1967) A deterministic inventory model for repairable items. Naval Research Logistics Quarterly 14(3):391-398Google Scholar
  117. Schonberger RJ, Schneiderjans MJ (1984) Reinventing inventory control. Interaces 14(3):76-83Google Scholar
  118. Schroeder RG, Krishnan, R (1976) Return on investment as a criterion for inventory models. Decision Sciences 7(4):697-704Google Scholar
  119. Schussel, G (1968) Job-shop lot release sizes. Management Science 14(8): B-449-B472Google Scholar
  120. Silver EA, Pyke DF, Petersen R (1998) Inventory Management and Production Planning and Scheduling, Third Edition. New York, NY: John Wiley & SonsGoogle Scholar
  121. Soyster AL, Enscore EE (1975) An EOQ model when production standards are assumed to be normally distributed. International Journal of Production Research 13(5):507-517Google Scholar
  122. Specht J, Kagan A (1994) Inventory valuation under cyclical demand: A modeling approach. Journal of Applied Business Research 10(4):97-103Google Scholar
  123. Stockton DJ (1993) Identifying economic order quantities using genetic algorithms. International Journal of Operations and Production Management 13(11):92-103Google Scholar
  124. Subramanyam ES, Kumaraswamy S (1981) EOQ formula under varying marketing polices and conditions. American Institute of Industrial Engineers Transactions 13:312-314Google Scholar
  125. Sucky E (2005) Inventory management in supply chains: A bargaining problem. International Journal of Production Economics 93-94:253-262Google Scholar
  126. Taft EW (1918) The most economical production lot. Iron Age 101:1410-1412Google Scholar
  127. Taleizadeh AA, Pentico DW, Jabalameli MS, Aryanezhad M (2013) An EOQ model with partial delayed payment and partial backordering. Omega 41(2):354-368Google Scholar
  128. Tanchoco JMA, Davis RP, Wysk RA (1980) Economic order quantities based on unit-load and material handling considerations. Decision Sciences 11(3):514-521Google Scholar
  129. Teng J-T (2009) A simple method to compute economic order quantities. European Journal of Operational Research 198(1):351-353Google Scholar
  130. Tersine RJ (1996) Economic replenishment strategies for announced price increases. European Journal of Operational Research 92(2):266-280Google Scholar
  131. Tersine RJ, Barman S (1991) Economic Inventory/Transport Lot Sizing with Quantity Freight Rate Discounts 22(5):1171-1179Google Scholar
  132. Tersine RJ, Price RL (1981) Temporary price discounts and EOQ. Journal of Purchasing and Materials Management 17(4):23-27Google Scholar
  133. Tersine RJ, Tersine MG (1986) EOQ modification for future price increases: An extension. Journal of Purchasing and Materials Management 22(3):33-34Google Scholar
  134. Teunter RH (2001) Economic ordering quantities for recoverable item inventory systems. Naval Research Logistics 48(6):484-495Google Scholar
  135. Teunter R (2004) Lot-sizing for inventory systems with product recovery. Computers and Industrial Engineering 46(3):431-441Google Scholar
  136. Toews C, Pentico DW, Drake MJ (2011) The deterministic EOQ and EPQ with partial backordering at a rate that is linearly dependent on the time to delivery. International Journal of Production Economics 131(2): 643-649Google Scholar
  137. Toklu B, Wilson JM (1995) An analysis of multi-level lot-sizing problems with a bottleneck under a rolling schedule environment. International Journal of Production Research 33(7):1835-1847Google Scholar
  138. Trippi RR, Lewin, DE (1974) A present value formulation of the classical EOQ problem. Decision Sciences 5(1):30-35Google Scholar
  139. Vazsonyi A (1957) Economic-lot-size formulas in manufacturing. Operations Research 5(1): 28-44Google Scholar
  140. Vujošević, MM, Petrović, D, Petrović, R (1996) EOQ formula when inventory cost is fuzzy. International Journal of Production Economics 45(1-3):499-504Google Scholar
  141. Wanga Y, Gerchak Y (1996) Continuous review inventory control when capacity is variable. International Journal of Production Economics 45(1-3):381-388Google Scholar
  142. Weiss HJ (1982) Economic order quantity models with nonlinear holding costs. European Journal of Operational Research 9(1):56-60Google Scholar
  143. Williams WW, Peters MH, Raiszdeh ME (1985) Time-dependent demand in requirements planning: An exploratory assessment of the effects of serially correlated demand sequences on lot-sizing performance. Journal of Operations Management 6(1):69-85Google Scholar
  144. Wilson GT (1977) When not to use the square root rule for the EOQ. Production and Inventory Management Journal 18(4):1-6Google Scholar
  145. Wilson JM (1991) Supplier credit in the Economic Order Quantity model. International Journal of Operations and Production Management 11(9):64-71Google Scholar
  146. Woolsey RED (1988) A requiem for the EOQ: An editorial. Production and Inventory Management Journal 29(3):68-72Google Scholar
  147. Yelle LE (1978a) Material requirements lot sizing: a multi-level approach. International Journal of Production Research 17(3):223-232Google Scholar
  148. Yelle LE (1978b) Lot sizing for the MRP multi-level problem. Industrial Management 20(4):4-7Google Scholar
  149. Zhang R-Q, Kaku I, Xiao Y-Y (2011) Deterministic EOQ with partial backordering and correlated demand caused by cross-selling. European Journal of Operational Research 210(3):537-551Google Scholar
  150. Zinn W, Charnes JM (2005) A comparison of the Economic Order Quantity and Quick Response inventory methods. Journal of Business Logistics 26(2):119-141Google Scholar
  151. Zipkin P (2000) Foundations of Inventory Management. New York, NY: McGraw-Hill/IrwinGoogle Scholar

Copyright information

© Springer Science+Business Media New York 2014

Authors and Affiliations

  1. 1.Palumbo-Donahue School of BusinessDuquesne UniversityPittsburghUSA

Personalised recommendations