Skip to main content

Abstract

By default, each path is timed for a single cycle, i.e., data launched at any edge of the clock should be captured by the next flop at the next rising edge of the clock on the destination flop. Figure 12.1 shows this relationship.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 159.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 2013 Springer Science+Business Media New York

About this chapter

Cite this chapter

Gangadharan, S., Churiwala, S. (2013). Multi Cycle Paths. In: Constraining Designs for Synthesis and Timing Analysis. Springer, New York, NY. https://doi.org/10.1007/978-1-4614-3269-2_12

Download citation

  • DOI: https://doi.org/10.1007/978-1-4614-3269-2_12

  • Published:

  • Publisher Name: Springer, New York, NY

  • Print ISBN: 978-1-4614-3268-5

  • Online ISBN: 978-1-4614-3269-2

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics