Advertisement

A Model of Bridge Choice Across the Mississippi River in Minneapolis

Conference paper
Part of the Transportation Research, Economics and Policy book series (TRES)

Abstract

On September 18, 2008, a replacement for the previously collapsed I-35W bridge opened to the public. Consequently, travelers were once again confronted with the opportunity to find better alternatives. The traffic pattern of the Minneapolis road network was likely to readjust, because of the new link addition. However, questions arise about the possible reasons (or components in the route choice process) that are likely to influence travelers crossing the Mississippi, who had to choose among several bridge options, including the new I-35W bridge. A statistical model of bridge choice is specified and estimated employing weighted-least squares logit, and using Global Positioning System (GPS) data and web-based surveys collected both before and after the replacement bridge opened. In this way, the proportion of I-35W trips can be estimated depending on the assigned values of the explanatory variables, which include statistical measures of the travel time distribution experienced by the subjects, alternative diversity, and others. The results show that travel time savings and reliability were the main reasons for choosing the new I-35W bridge.

Keywords

Travel Time Global Position System Travel Behavior Route Choice Global Position System Data 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Notes

Acknowledgements

This study was supported by the Oregon Transportation Research and Education Consortium (2008-130 Value of Reliability and 2009-248 Value of Reliability Phase II) and the Minnesota DOT project “Traffic Flow and Road User Impacts of the Collapse of the I-35W Bridge over the Mississippi River.” We would also like to thank Kathleen Harder, John Bloomfield, and Shanjiang Zhu.

References

  1. Census (2006–2008) American Community Survey 3-Year Estimates, Minneapolis-St. Paul-Bloomington, MN-WI Metropolitan Statistical Area. http://factfinder.census.gov/. Accessed 25 Nov 2009
  2. Chang S, Nojima N (2001) Measuring post-disaster transportation system performance: the 1995 Kobe Earthquake in comparative perspective. Transp Res A 35(6):475–494CrossRefGoogle Scholar
  3. Dimitriou D, Karlaftis M, Kepaptsoglou K, Stathopoulos M (2006) Public transportation during the Athens 2004 Olympics: from planning to performance. In: Proceedings of the 85th Transportation Research Board Annual Meeting, Washington, DCGoogle Scholar
  4. van Exel N, Rietveld P (2001) Public transport strikes and traveller behaviour. Transp Policy 8(4):237–246CrossRefGoogle Scholar
  5. Ferguson E (1992) Transit ridership, incident effects and public policy. Transp Res A 26(5): 393–407CrossRefGoogle Scholar
  6. Giuliano G, Golob J (1998) Impacts of the Northridge earthquake on transit and highway use. J Transp Stat 1(2):1–20Google Scholar
  7. Hensher D, Brewer A (2002) Going for gold at the Sydney Olympics: how did transport perform? Transp Rev 22(4):381–399CrossRefGoogle Scholar
  8. Hunt BA J, Stefan K (2002) Responses to centre street bridge closure: where the disappearing travelers went. Transp Res Rec 1807:51–58CrossRefGoogle Scholar
  9. Lo S, Hall R (2006) Effects of the Los Angeles transit strike on highway congestion. Transp Res A 40(10):903–917Google Scholar
  10. Ruud P (2000) An introduction to classical econometric theory. Oxford University Press, OxfordGoogle Scholar
  11. Trivedi PK, Cameron AC (2005) Microeconometrics: methods and applications. Cambridge University Press, CambridgeGoogle Scholar
  12. Tsuchida P, Wilshusen L (1991) Effects of the 1989 Loma Prieta earthquake on commute behavior in Santa Cruz County, California. Transp Res Board 1321:26–33Google Scholar
  13. Wesemann L, Hamilton T, Tabaie S, Bare G (1996) Cost-of-delay studies for freeway closures caused by Northridge earthquake. Transp Res Rec 1559:67–75CrossRefGoogle Scholar
  14. Zhu S, Levinson D (2011) Disruptions to transportation networks: a review. In: Levinson D, Liu H, Bell M (eds) Network reliability in practice. Springer, pp xxx–xxxGoogle Scholar
  15. Zhu S, Levinson D, Liu H, Harder K (2010) The traffic and behavioral effects of the I-35W Mississippi River Bridge collapse. Transp Res A 44(10):771–784CrossRefGoogle Scholar
  16. Zhu S, Tilahun N, He X, Levinson D (2011) Travel impacts and adjustment strategies of the collapse and the reopening of I-35W Bridge. In: Levinson D, Liu H, Bell M (eds) Network reliability in practice. Springer, pp xxx–xxxGoogle Scholar

Copyright information

© Springer Science+Business Media, LLC 2012

Authors and Affiliations

  1. 1.Department of Civil EngineeringUniversity of MinnesotaMinneapolisUSA
  2. 2.RP Braun-CTS Chair of Transportation Engineering, and Director of NetworkEconomics, and Urban Systems Research GroupMinneapolisUSA

Personalised recommendations