Skip to main content

Managing Qualities, Tones and Gages of Ceramic Supply Chains Through Master Planning

  • Conference paper
  • First Online:
Annals of Industrial Engineering 2012
  • 1190 Accesses

Abstract

Ceramic production processes are characterized by providing quantities of the same finished goods that differ in qualities, tones and gages. This aspect becomes a problem for ceramic supply chains (SCs) that should promise and serve customer orders with homogeneous quantities of the same finished good. In this paper a mathematical programming model for the centralized master planning of ceramic SCs is proposed. Inputs to the master plan include demand forecasts in terms of customer order classes based on their order size and splitting percentages of a lot into homogeneous sub-lots. Then, the master plan defines the size and loading of lots to production lines and their distribution with the aim of maximizing the number of customer orders fulfilled with homogeneous quantities in the most efficient manner for the SC.

This research has been carried out in the framework of the project funded by the Spanish Ministry of Economy and Competitiveness (Ref. DPI2011-23597) and the Polytechnic University of Valencia (Ref. PAID-06-11/1840) entitled “Methods and models for operations planning and order management in supply chains characterized by uncertainty in production due to the lack of product uniformity” (PLANGES-FHP).

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 219.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • Alarcón F, Alemany MME, Lario FC, Oltra RF (2011) La falta de homogeneidad del producto (FHP) en las empresas cerámicas y su impacto en la reasignación de inventario. Boletín de la Sociedad Española de Cerámica y Vidrio 50(1):49–58

    Article  Google Scholar 

  • Alemany MME, Boj JJ, Mula J, Lario FC (2010) Mathematical programming model for centralised master planning in ceramic tile supply chains. Int J Prod Res 48(17):5053–5074

    Article  MATH  Google Scholar 

  • Özdamar L, Birbil SI (1998) Hybrid heuristics for the capacitated lot sizing and loading problem with setup times and overtime decisions. Eur J Oper Res 110:525–547

    Article  MATH  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to M. M. E. Alemany Díaz .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2014 Springer-Verlag London

About this paper

Cite this paper

Mundi, M.I., Alemany Díaz, M.M.E., Boza, A., Poler, R. (2014). Managing Qualities, Tones and Gages of Ceramic Supply Chains Through Master Planning. In: Prado-Prado, J., García-Arca, J. (eds) Annals of Industrial Engineering 2012. Springer, London. https://doi.org/10.1007/978-1-4471-5349-8_22

Download citation

  • DOI: https://doi.org/10.1007/978-1-4471-5349-8_22

  • Published:

  • Publisher Name: Springer, London

  • Print ISBN: 978-1-4471-5348-1

  • Online ISBN: 978-1-4471-5349-8

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics