Contractual Issues

Chapter
Part of the Green Energy and Technology book series (GREEN)

Abstract

Once the retrofit measures have been identified, the remedial action should be implemented and energy performance must then be maintained. For the implementation of the measures and the management of building and facilities the owner/client can refer to external companies. A careful definition of contractual issues is a key element to promote the sustainable upgrading of a building in a transparent and efficient way. This chapter analyses aspects related to contractual issues within energy retrofit and energy management.

Keywords

Combustion Europe Expense 

References

  1. 1.
    Zabot S (2011) Schemi contrattuali, on green energy audit. Edizioni Ambiente, MilanoGoogle Scholar
  2. 2.
    Haberl JH, Culp C, Claridge DE (2005) Ashrae’s guideline 14-2002 for measurement of energy and demand savings: how to determine what was really saved by the retrofit. In: Proceedings of the 5th international conference for enhanced building operations, Pittsburgh, Pennsylvania, 11–13 October 2005Google Scholar
  3. 3.
    DOE/GO (2002) International Performance Measurement & Verification Protocol, International Performance Measurement & OE/GO (2002) International Performance Measurement & Verification Protocol: concepts and options for determining energy and water savingsGoogle Scholar

Copyright information

© Springer-Verlag London 2013

Authors and Affiliations

  1. 1.Department Architecture, Built environment and Construction engineering (ABC)Politecnico di MilanoMilanItaly

Personalised recommendations