Abstract
This chapter presents the results of economic calculations of the specific cost of electricity production in an existing 370 MW power unit adapted to a dual-fuel gas-steam system and in a new one for supercritical parameters. The calculations involved a power unit with the capacity of 800 ÷ 900 MW.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Bartnik R (2009) Combined cycle power plants. Thermal and economic effectiveness. WNT, Warszawa
Bartnik R, Buryn Z (2011) Conversion of coal-fired power plants to cogeneration and combined-cycle. Thermal and economic effectiveness. Springer, London
Bartnik R (2008) Technical and economic efficiency account in utility power engineering. Oficyna Wydawnicza Politechniki Opolskiej, Opole
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
Copyright information
© 2013 The Author(s)
About this chapter
Cite this chapter
Bartnik, R. (2013). Comparison of Specific Cost of Producing Electricity in a 370 MW Power Unit Adapted to Dual–Fuel Gas–Steam System and in a New One Operating Under Supercritical Parameters. In: The Modernization Potential of Gas Turbines in the Coal-Fired Power Industry. SpringerBriefs in Applied Sciences and Technology. Springer, London. https://doi.org/10.1007/978-1-4471-4860-9_7
Download citation
DOI: https://doi.org/10.1007/978-1-4471-4860-9_7
Published:
Publisher Name: Springer, London
Print ISBN: 978-1-4471-4859-3
Online ISBN: 978-1-4471-4860-9
eBook Packages: EngineeringEngineering (R0)