Advertisement

A Proposed Novel Knowledge Framework for Remanufacturing Viability in a Modern Supply Chain

  • L. M. Justham
  • E. L. Rosamond
  • P. A. Goodall
  • P. P. Conway
  • A. A. West
Conference paper

Abstract

Due to increasing legislative demand and rising material and energy costs, there have been growing interests in maximising the useful phase of a product’s lifecycle via sustainable extended-life options such as remanufacturing. Due to the modern disparate nature of the manufacturing supply chain, there are several complex issues to be recognised when embarking on end of life product processing, including data availability and the corresponding knowledge gaps that prevent businesses from effective decision making. This paper presents a novel knowledge-based framework, designed to support a business in assessing the suitability of a product for remanufacture when considering critical product parameters and business key performance indicators (KPIs). The structure of the framework is discussed and an example case study is presented in the context of business knowledge requirements for remanufacturing.

Keywords

Remanufacture Knowledge gap Framework 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Directive 2000/53/EC - the ELV Directive, September 2000Google Scholar
  2. Directive 2002/95/EC EU - legislation restricting the use of hazardous substances in electrical and electronic equipment, February 2003Google Scholar
  3. Directive 2002/96/EC - promoting the collection and recycling of such equipment, February 2003Google Scholar
  4. Ijomah, WL, Hammond, GP, Childe, SJ, McMahon, CA, (2005) A Robust Description and Tool for Remanufacturing: A Resource and Energy Recovery Strategy, Environmentally Conscious Design and Inverse Manufacturing, Eco Design 2005, Fourth International Symposium. Pages 472-479Google Scholar
  5. Directive 2008/98/EC – The Waste Framework Directive (WFD)Google Scholar
  6. Khang, DB, Myint, YM, (1999) Time, cost and quality trade-off in project management: a case study, Int. J. Project Manage. 17, 249-256.Google Scholar
  7. Atkinson, R (1999) Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria, Int. J. Project Manage. 17, 337-342.Google Scholar
  8. Centre for Remanufacturing & Reuse (2008) The Potential for Remanufacturing of Wind Turbines December 2008 Simon Walton, David ParkerGoogle Scholar
  9. Puigcorbe, J, De-Beaumont, A June 3, 2010, Wind Turbine Gearbox Reliability, Renewable Energy World.com (http://www.renewableenergyworld.com/rea/news/article/2010/06/wind-turbine-gearbox-reliability)

Copyright information

© Springer-Verlag London 2013

Authors and Affiliations

  • L. M. Justham
    • 1
  • E. L. Rosamond
    • 1
  • P. A. Goodall
    • 1
  • P. P. Conway
    • 1
  • A. A. West
    • 1
  1. 1.Wolfson School of Mechanical and Manufcaturing EngineeringLoughborough UniverstyLoughboroughUK

Personalised recommendations