Abstract
Integration between different phases of the production process is one of today’s key issues in manufacturing. This is so for process planning and shop floor control as well. Process planning creates work instructions to manufacture a part and shop floor control schedules and executes these instructions to get the final products on time and with reasonable cost. However, process planning inevitably imposes constraints on the utilization of machining resources. In particular, the routing of the parts and the necessary machining times on the various resources is primarily determined by the process plans attached to them. These constraints are due to the decisions concerning the kinds of processes that should be carried out in an appropriate order to produce a part, which satisfies the original specification.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Bibliography
Chryssolouris G, Chan S 1985 An Integrated Approach to Process Planning and Scheduling, Annals of the CIRP 34/1:413–415.
Tönshoff H K, Kreutzfeld J and Hofschneider, D 1993 Concurrent Process Planning and Workshop Control in Batch Production, Proceedings of the CIRP Seminars, Manufacturing Systems 22/3:231 -241.
COMPLAN, ESPRIT Project 6805, Public Domain Report, http://www.mech.kuleuven.ac.be/pma/project/complan/complan.html
Brandimarte P, Calderini M 1992 Integrated Process Planning and Shop Scheduling by Local Search Algorithms, In: Pels H J, Wortmann J C (eds) Integration in Production Management Systems, IFIP, 257–276.
Lee S, Wysk A and Smith J S 1994 Process Planning Interface for a Shop Floor Control Architecture for Computer-Integrated Manufacturing, Int. J. Production Research 33/9:2415–2435.
Catron B A, Ray B 1991 ALPS: A Language for Process Specification, Int. J. Computer Integrated Manufacturing 4/2:105–113.
Carlier J, Pinson E 1990 A Practical Use of Jackson’s Preemptive Schedule for Solving the Job-Shop Problem, Annals of Operation Research 26:269–287.
Nowicki E, Smutnicki C 1996 A Fast Tabu Search Algorithm for the Job-Shop Problem, Management Science 42/6:797–813.
Balas E, Vazacopoulos A 1995 Guided Local Search with Shifting Bottleneck for Job Shop Scheduling, Management Science Research Report #MSR R-609, Carnegie- Mellon University, Pittsburgh.
Nemhauser G L, Wolsey L A 1988 Integer and Combinatorial Optimization, John Wiley&Sons, Inc.
Chu P C, Beasley J E 1998 A Genetic Algorithm for the Multidimensional Knapsack Problem, http://mscmga.ms.ic.ac.uk/jcb/jcb.html.
Blazewicz J, Domschke W and Pesch E 1996 The Job-Shop Scheduling Problem: Conventional and new Solution Techniques, European Journal of Operation Research 93:1–33.
Ramudhin A, Marier P 1996 The Generalized Shifting Bottleneck Procedure, European Journal of Operation Research 93:34–38.
Beasley, J. E., OR-Library, http://mscmga.ms.ic,ac.uk/info.html.
Rights and permissions
Copyright information
© 1999 Springer-Verlag London Limited
About this paper
Cite this paper
Kis, T., Xirouchakis, P. (1999). Concepts for Integrating Process Planning and Production Scheduling. In: Advances in Manufacturing. Advanced Manufacturing. Springer, London. https://doi.org/10.1007/978-1-4471-0855-9_1
Download citation
DOI: https://doi.org/10.1007/978-1-4471-0855-9_1
Publisher Name: Springer, London
Print ISBN: 978-1-4471-1217-4
Online ISBN: 978-1-4471-0855-9
eBook Packages: Springer Book Archive