Skip to main content

Hydropower, Salmon and the Penobscot River (Maine, USA): Pursuing Improved Environmental and Energy Outcomes Through Participatory Decision-Making and Basin-Scale Decision Context

  • Chapter
  • First Online:
Stakeholders and Scientists

Abstract

The Penobscot River is the largest river within Maine and historically one of the most important rivers in New England for Atlantic salmon and other migratory fish. For more than a century, the economically and culturally important fish populations have been depressed dramatically due to hydropower dams on the mainstem river that prevented access to spawning habitat. In 2004, a broad coalition of stakeholders – including a hydropower company, the Penobscot Indian Nation, state and Federal agencies, and several conservation organizations – signed the Lower Penobscot River Comprehensive Settlement Accord. The Accord features two primary projected outcomes: a dramatic, ecologically significant increase in the proportion of the basin accessible to migratory fish combined with maintenance of, or potentially an increase in, energy generation. Increased access to migratory fish habitat will be accomplished through removal of two dams and construction of a naturalistic fish bypass around a third, while the energy generation lost due to dam removal will be recouped through structural and operational changes to remaining dams. Here we emphasize two essential conditions that made possible an agreement on the Penobscot that will benefit both energy generation and environmental and social interests. The first condition was the degree and type of stakeholder participation within the Penobscot’s decision-making context and the second is the spatial scale of the decision making – the entire system of dams on the lower river. The Penobscot Accord reflects the evolving role of stakeholders in hydropower decision making. Emulating the spatial scale of the Accord, which allowed the stakeholders to select from a broader range of alternatives to benefit both energy and the environment, will require further evolution of stakeholder involvement.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 89.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 119.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • Adams WM, Hughes FMR (1986) The environmental effects of dam construction in tropical Africa: impacts and planning procedures. Geoforum 17:403–410

    Article  Google Scholar 

  • Ames EP, (2004). Atlantic cod stock structure in the Gulf of Maine. Fisheries 29(1):10–28

    Google Scholar 

  • Bosshard P (2010) The dam industry, the World Commission on Dams and the Hydropower Sustainability Assessment Forum (HSAF) process. Water Alt 3(2):58–70

    Google Scholar 

  • Bunn SE, Arthington AH (2002) Basic principles and ecological consequences of altered flow regimes for aquatic biodiversity. Environ Manage 30:492–507

    Article  Google Scholar 

  • Crane J (2009) Setting the river free: the removal of the Edwards Dam and the restoration of the Kennebec River. Water History 1:131–148

    Google Scholar 

  • Department of Energy (DOE), Department of the Interior (DOI), and Department of the Army (DOA) (2010) Memorandum of Understanding for Hydropower. March, 2010

    Google Scholar 

  • Dudgeon D (2000) Large-scale hydrological changes in tropical Asia: prospects for riverine biodiversity. Bioscience 50:793–806

    Article  Google Scholar 

  • Echeverria JD, Barrow P, Roos-Collins R (1989) Rivers at Risk: a concerned citizen’s guide to hydropower. Island Press, Washington

    Google Scholar 

  • Federal Energy Regulatory Commission (FERC) (1997) Final Environmental Impact Statement Licensing Three Hydroelectric Projects in the Lower Penobscot River Basin, FERC Project Nos. 2403-056, 2312-019 and 2721-020, Washington

    Google Scholar 

  • Federal Energy Regulatory Commission (FERC) (2004) Submittal of the Lower Penobscot River Basin Comprehensive Settlement Accord with Explanatory Statement. Project Nos. 2403, 2534, 2666, 2710, 2712, 2721, and 10981. Federal Register, Docket No. DI97–10

    Google Scholar 

  • Federal Energy Regulatory Commission (FERC) (2010) Final Environmental Assessment, Application for Surrender of License, Veazie, Great Works and Howland Projects Nos. 2403-056, 2312-019, and 2721-020

    Google Scholar 

  • Foster NW, Atkins CG (1869) Report of Commission of Fisheries. Commissioners of Fisheries, Augusta

    Google Scholar 

  • Gillilan DM, Brown TC (1997) Instream Flow Protection: seeking a balance in Western water use. Island Press, Washington

    Google Scholar 

  • Gunkel G (2009) Hydropower – a green energy? Tropical reservoirs and greenhouse gas emissions. Clean – Soil, Air, Water 37:726–734

    Article  CAS  Google Scholar 

  • Hydropower Reform Coalition (HRC) (2005) Citizen toolkit for effective participation in hydropower relicensing, Washington

    Google Scholar 

  • Kosnik L (2010) Balancing environmental protection and energy production in the Federal hydropower licensing process. Land Econ 86:444–466

    Google Scholar 

  • Ligon FK, Dietrich WE, Trush WJ (1995) Downstream ecological effects of dams. Bioscience 45:183–191

    Article  Google Scholar 

  • Maine Department of Marine Resources (2009) Operational plan for the restoration of diadromous fishes to the Penobscot River, Augusta

    Google Scholar 

  • Mekong River Commission (2005) Fisheries Annual Report. Phnom Penh

    Google Scholar 

  • Montgomery DR (2003) King of Fish: the thousand-year run of salmon. Westview Press, Boulder

    Google Scholar 

  • National Research Council (NRC) (2004) Atlantic Salmon in Maine. The National Academies Press, Washington

    Google Scholar 

  • Opperman JJ, Apse C, et al (in press) The Penobscot River (Maine, USA): a basin-scale approach to balancing power generation and ecosystem restoration. Ecology and Society

    Google Scholar 

  • Pollak D (2007) S.D. Warren and the erosion of federal preeminence in hydropower regulation. Ecol Law Q 34:763–800

    Google Scholar 

  • Portland General Electric (PGE) (2006) Pelton Butte Fact Sheet

    Google Scholar 

  • Richter BD, Braun DP et al (1997) Threats to imperiled freshwater fauna. Conserv Biol 11:1081–1093

    Article  Google Scholar 

  • Richter BD, Thomas GA (2007) Restoring environmental flows by modifying dam operations. Ecol Soc 12(1):article 12

    Google Scholar 

  • Richter B, Postel S et al (2010) Lost in development’s shadow: the downstream human consequences of dams. Water Alt 3(2):14–42

    Google Scholar 

  • Sanger D, Belcher WR, Kellog DC (1992) Early Holocene occupation at the Blackman Stream Site, central Maine. In: Robinson BS, Petersen BJ, Robinson AK (editors) Early Holocene Occupation in Northern New England. Maine Historic Preservation Commission, Augusta

    Google Scholar 

  • Saunders R, Hachey MA, Fay CW (2006) Maine’s diadromous fish community: past, present, and implications for Atlantic salmon recovery. Fish 31(11):537–547

    Article  Google Scholar 

  • Shabecoff P (1993) A Fierce Green Fire. Harper Collins, New York

    Google Scholar 

  • United States Geological Survey (USGS) (2010) Hydroelectric power water use. http://ga.water.usgs.gov/edu/wuhy.html. Accessed 1 Sept 2010

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Jeffrey J. Opperman .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2011 Springer Science+Business Media, LLC

About this chapter

Cite this chapter

Opperman, J.J. et al. (2011). Hydropower, Salmon and the Penobscot River (Maine, USA): Pursuing Improved Environmental and Energy Outcomes Through Participatory Decision-Making and Basin-Scale Decision Context. In: Burger, J. (eds) Stakeholders and Scientists. Springer, New York, NY. https://doi.org/10.1007/978-1-4419-8813-3_13

Download citation

Publish with us

Policies and ethics