Advertisement

The Principles And Planning Process Of An Electronic Kanban System

  • I.A. Kouri
  • T.J. Salmimaa
  • I.H. Vilpola

Abstract

The ideas of pull production managed by kanban-cards are well documented in the literature and are in practice worldwide. The advance of ICT technologies like RFID technology presents us with the opportunity to develop more advanced ICT supported electronic kanban solutions. This study defines the factors influencing the success of electronic kanban systems and describes how they should be taken into account in the planning process.

The study suggests that the understanding of original pull planning philosophy is important. The shop floor practices refined in leading companies utilizing the pull production system have to taken into account while planning the practical ICT applications. The UCD process is important, since the original ideas have to be infused in shop floor information and material flow control systems where the human-computer system interaction takes place.

Keywords

Batch Size Shop Floor Truck Driver User Centered Design Kanban System 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. [1]
    Ohno T. 1988 The Toyota Production System, Productivity Press.Google Scholar
  2. [2]
    Shingo S. 1982 Study of the Toyota Production System, Japan Management Association.Google Scholar
  3. [3]
    Monden J. 1983, Toyota Production System, Industrial Engineering and Management Press.Google Scholar
  4. [4]
    Hopp, W., Spearman, M. 2000 Factory physics, Irwin/ McGraw-Hill.Google Scholar
  5. [5]
    Liker J.K. 2004, The Toyota Way, McGraw-Hill,Google Scholar
  6. [6]
    Schonberger R. 1982, Japanese manufacturing techniques, The Free Press.Google Scholar
  7. [7]
    Gupta S., Al-Turki Y. Perry R. 1999. Flexible kanban system, International Journal of Operations & Production Management. Vol. 19(10), 1065-1093.CrossRefGoogle Scholar
  8. [8]
    Ansari A., Modarress B. 1995, Wireless kanban, Production and Inventory Management Journal. Vol. 36(1), 60-64.Google Scholar
  9. [9]
    Drickhamer D. 2005, The kanban e-volution, Material Handling Management, March 24-26.Google Scholar
  10. [10]
    Vernyi B., Vinas T. 2005, Easing into e-kanban. Industry Week, December, 32.Google Scholar
  11. [11]
    Harmon R., Peterson L. 1990. Reinventing the factory, The Free Press.Google Scholar
  12. [12]
    Cullen T. 2002, Toyota speeds parts delivery with e-kanban, Automotive News Europe, Vol. 7(18), s. 49.Google Scholar
  13. [13]
    Chappell L. 2005. Automotive News. Vol. 79(6153), s. 28.Google Scholar
  14. [14]
    Kärkkäinen M., Holmström J. 2002. Wireless product identification: enabler for handling efficiency, customization and information sharing, Supply Chain Management, An International Journal. Vol. 7(4), 242-252.Google Scholar
  15. [15]
    Bicheno J. 2004, The new lean toolbox: towards fast, flexible flow, PICSIE Books.Google Scholar
  16. [16]
    Kochan A. 2006. BMW innovates at new Leipzig assembly plant, Assembly Automation, Vol. 26(2), 111-114.CrossRefGoogle Scholar
  17. [17]
    SAP 2006, BWP_SB_RFID Technology for Automotive,[http:/ / www.sap.com/ industries/ automotive/ pdf/ BWP_SB_RFID_Technology_for_Automotive.pdf].Google Scholar
  18. [18]
    Mertins K., Lewandrowski U. 1999, Inventory safety stocks of kanban control systems. Production Planning and Control. Vol. 10(6), 520-529.CrossRefGoogle Scholar

Copyright information

© Springer Science+Business Media B.V. 2008

Authors and Affiliations

  • I.A. Kouri
    • 1
  • T.J. Salmimaa
    • 1
  • I.H. Vilpola
    • 1
  1. 1.Institute of Industrial Management Tampere University on TechnologyInstitute of Human-Centered TechnologyTampere University on TechnologyFinland

Personalised recommendations