Abstract
This paper presents the results of a research carried out in five companies of the Brazilian telecommunications market: Vivo, TIM, Claro, Embratel and Intelig. The aim was to estimate the maturity level of the software development processes, according to the CMMI (Capability Maturity Model Integration) criteria. The chosen instrument was a questionnaire applied to IT (Information Technology) teams from each company, which made possible to estimate the current maturity level and identify improvement points, in a much faster and economic way compared to traditional appraisals, such as SCAMPI (Standard CMMI Appraisal Method for Process Improvement). The measured maturity levels were low for almost every team selected as a sample.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
M. C. Paulk, B. Curtis, M. B. Chrissis, and C. V. Weberm “Capability Maturity Model for Software. Version 1.1”, Software Engineering Institute, CMU/SEI-93-TR-24, 1993. [Online] Available:http://www.sei.cmu.edu/pub/documents/93.reports/pdf/tr24.93.pdf
B. K Clark, “Quantifying the effects of process improvement on effort”, Proceedings of the IEEE, Vol. 17, Issue 6, p. 4, Nov-Dec 2000.
H. Saiedian and R. Kuzara, “SEI capability maturity model impact on contractors”, Proceedings of the IEEE, Vol. 28, Issue 1, p. 7, Jan. 1995.
B. Hansen, J. Rose and G. Tjornehoj, “Prescription, description, reflection: the shape of the software process improvement field”, International Journal of Information Management, Oxon: Elsevier Sci LTD, v.6, n.29, p 457-472, December 2004.
SEI, “Capability maturity model integration (CMMISM), version 1.1. Staged Representation”, 2002. [Online] Available:http://www.sei.cmu.edu/pub/documents/02.reports/pdf/02tr012.pdf
SEI, “Capability maturity model integration (CMMISM), version 1.1. Continuous Representation”, 2002. [Online] Available:http://www.sei.cmu.edu/pub/documents/02.reports/pdf/02tr011.pdf
H. L. M. M, Quintella, “Fatores humanos e tecnológicos da competitividade”, UFF, 1997.
H. L. M. M. Quintella, “ORIENTEL, Um método de orientação de mestrandos”, UFF, 1997.
K. R. Popper, “A lógica da pesquisa científica.”, 2nd ed., Ed. Cultrix, 1975.
H. L. M. M. Quintella, H. M. Rocha and M. F. Alves, “Automobile Project management: Critical success factors in product start-up”. InRevista Produção, pp 334-346, V.15(3). ABEPRO – EPUSP, 2006.
H. L. M. M. Quintella and H. M. Rocha, “Medindo o nível de maturidade dos processos de desenvolvimento de produto de montadoras de veículos com o CMMI”. In Mundo PM Project Management Magazine, pp 24-26, Vol. 6 Mundo, Jan. 2006.
H. M. Rocha, “Análise dos fatores críticos de sucesso de start up de veículos automotives e a qualidade dos métodos de desenvolvimento de produtos dessa indústria na região sul fluminense”. UFF, Mestrado em Sistemas de Gestão, Dissertação, 2005.
M. Blanco, P. Gutiérrez and G. Satriani, “SPI Patterns: Learning from Experience”, Proceedings of the IEEE, Vol 18, Issue 3, p.7, May-June 2001.
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2008 Springer Science+Business Media B.V.
About this paper
Cite this paper
Quintella, H., Barros, L. (2008). A Simple Way for Preparing to a CMMI Appraisal. In: Elleithy, K. (eds) Innovations and Advanced Techniques in Systems, Computing Sciences and Software Engineering. Springer, Dordrecht. https://doi.org/10.1007/978-1-4020-8735-6_57
Download citation
DOI: https://doi.org/10.1007/978-1-4020-8735-6_57
Publisher Name: Springer, Dordrecht
Print ISBN: 978-1-4020-8734-9
Online ISBN: 978-1-4020-8735-6
eBook Packages: Computer ScienceComputer Science (R0)