Abstract
One of the peculiarities of the construction industry is that work is obtained in the form of contracts for projects which are large and indivisible but that the work load relating to each project is spread over a long period of time. Costs (and revenue: see Chapter 12) have therefore to be examined in three distinct ways. The first is the cost of the project as a whole; secondly, the cost of the total project must be related to the work load over time; and lastly, the cost of various alternative work loads at a given point in time must be analysed. The usual cost curves of economic analysis are of this last type. The method of transition from the first to the third will be discussed first.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Construction Industry Research and Information Association, Pre-Contract Delays in Civil Engineering Projects (FCEC, 1982)
Lea, Eleanor, Lansley, Peter and Spencer, Paul, Efficiency and Growth in the Building Industry: A Study of Twenty-three Building Firms (Ashridge Management College Research Unit, 1972)
Department of the Environment, Housing & Construction Statistics, 1972–1982 (HMSO, 1983) Tables 3.1, 3.9, and 3.10
Turin, D.A., The Mechanism of Response to Effective Demand; A Conceptual Framework (University College Environmental Research Group, Building Economics Research Unit, University College London, 1972)
Smith, C.A. (1955), Friedman, Milton (1955) and Bain, Joe S. (1954), in Archibald, G.C. (ed.), The Theory of The Firm (Penguin Books, 1971)
Halde, John and Witcombe, David (1967), Williamson, Oliver E. (1967), Stigler, George J. (1958), Shephard, William G. (1967) and Hymer, Stephen and Pastugen, Peter (1962), in Needham, Douglas (ed.), Readings in the Economics of Industrial Organisation (New York: Holt, Rinehart & Winston, 1970)
Hague, D.C., Managerial Economics: Analysis for Business Decisions (Longman, 1969) pp. 117–19
Williamson, Oliver E., ‘Hierarchical Control and Optimum Firm Size’ (1967), in Needham, Douglas (ed.), Readings in the Economics of Industrial Organisation (see ref. 6)
Bishop, D. ‘Productivity in the Building Industry’, Royal Society Symposium on Building Technology in the 1980s, 4 Nov. 1971
Copyright information
© 1985 Patricia N. Hillebrandt
About this chapter
Cite this chapter
Hillebrandt, P.M. (1985). Costs of the Construction Firm. In: Economic Theory and the Construction Industry. Palgrave Macmillan, London. https://doi.org/10.1007/978-1-349-17934-3_9
Download citation
DOI: https://doi.org/10.1007/978-1-349-17934-3_9
Publisher Name: Palgrave Macmillan, London
Print ISBN: 978-0-333-37454-2
Online ISBN: 978-1-349-17934-3
eBook Packages: Palgrave Economics & Finance CollectionEconomics and Finance (R0)