Abstract
This chapter is concerned with the control of the cost of projects by the design team throughout both the design and constructional processes and the methods by which the contractor monitors and regulates the cost of construction on site. The quantity surveyor has an important role in all these processes.
Preview
Unable to display preview. Download preview PDF.
References
Royal Institution of Chartered Surveyors, Quantity Surveyors Division. Pre-contract Cost Control and Cost Planning (1982)
I.H. Seeley. Building Economics. Macmillan (1983)
Royal Institution of Chartered Surveyors. Surveyors and their Future: Report of the Special Committee (Future of the Profession) (1970)
Royal Institution of Chartered Surveyors. Report of RICS Review Committee. Surveying in the Eighties (1980)
B. Fine. The control of site costs. Construction Projects: Their Financial Policy and Control. Construction Press (1982)
Royal Institute of British Architects. Handbook of Architectural Practice and Management (1973)
P.S. Brandon and R.G. Moore. Microcomputers in Building Appraisal. Granada (1983)
G. Smith. Cost planning the design process. Chartered Quantity Surveyor (August 1980)
S. Welford. Total cost management. Chartered Quantity Surveyor (July 1983)
K. Mathur. Resource and performance optimisation. Chartered Quantity Surveyor (June 1982)
D. Robertson. A new cost data bank. Chartered Quantity Surveyor (July 1983)
RICS Building Cost Information Service. Quarterly Review of Building Prices (August 1982)
R. Flanagan and G. Norman. Life Cycle Costing for Construction. Royal Institution of Chartered Surveyors (1983)
D.N. Morris. Energy conservation performances in local authority buildings. Experience of Energy Conservation in Buildings. Construction Press (1981)
ANBAR. How to Cut Energy Costs. Anbar Publications (1981)
W.T. Meyer. Energy Economics and Building Design. McGraw-Hill (1983)
J. Nisbet. A sadly neglected skill. Chartered Quantity Surveyor (January 1979)
The Aqua Group. Contract Administration for Architects and Quantity Surveyors. Granada (1981)
H. McKeag. Post contract cost control systems. Quantity Surveying Weekly (26 October 1978)
J Nisbet. After the contract is over. Chartered Quantity Surveyor (May 1981)
B. Meopham. Cost control for the civil engineering contractor. Chartered Quantity Surveyor (June 1983)
D.H. Somerville. Cash Flow and Financial Management Control. Surveying Information Service, Chartered Institute of Building (1981)
B. Cooke and W.B. Jepson. Cost and Financial Control for Construction Firms. Macmillan (1979)
D.T. Stubbington. Preliminaries — Improving Cash Flow. Estimating Information Service, Chartered Institute of Building (1977)
J.G. Gunning. Site management — mainly a process of control. Building Technology and Management (December 1983)
Institute of Chartered Accountants in England and Wales. Statement of Standard Accounting Practice No. 9: Stocks and Works in Progress (1975)
F.R. Barrett. Cost Value Reconciliation. Chartered Institute of Building (1981)
Author information
Authors and Affiliations
Copyright information
© 1984 Ivor H. Seeley
About this chapter
Cite this chapter
Seeley, I.H. (1984). Cost Control of Construction Projects. In: Quantity Surveying Practice. Macmillan Building and Surveying Series. Palgrave, London. https://doi.org/10.1007/978-1-349-17599-4_8
Download citation
DOI: https://doi.org/10.1007/978-1-349-17599-4_8
Publisher Name: Palgrave, London
Print ISBN: 978-0-333-36858-9
Online ISBN: 978-1-349-17599-4
eBook Packages: EngineeringEngineering (R0)