The general procedure adopted by most quantity surveying offices up to the stage of inviting tenders was described in chapter 2. The present chapter examines tendering procedures in more detail and then describes the normal arrangements for the evaluation of tenders. This is followed by an examination of general contractual arrangements, and the nature and form of the various standard forms of contract and sub-contract.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. 1.
    National Joint Consultative Committee for Building. Code of Procedure for Single Stage Tendering (1977)Google Scholar
  2. 2.
    National Economic Development Office. The Public Client and the Construction Industries. HMSO (1975)Google Scholar
  3. 3.
    Economic Development Committee for Building. Action on the Banwell Report. HMSO (1967)Google Scholar
  4. 4.
    A.J. Willis and W.N.B. George. The Architect in Practice. Granada (1981)Google Scholar
  5. 5.
    R.F. Elliott. Building Contract Litigation. Oyez (1981)Google Scholar
  6. 6.
    R. Porter. Building Contract Conditions. Godwin (1980)Google Scholar
  7. 7.
    Association of Consultant Architects. Form of Building Agreement (1982)Google Scholar
  8. 8.
    Chartered Institute of Building. Code of Estimating Practice (1983)Google Scholar
  9. 9.
    R.S. Harrison. Estimating and tendering — some aspects of theory and practice. CIOB Estimating Information Service No. 41 (1981)Google Scholar
  10. 10.
    F.A.W. Davies. Preparation and settlement of competitive tenders for building work. CIOB Estimating Information Service No. 16 (April 1975)Google Scholar
  11. 11.
    ICE Conditions of Contract Standing Committee. Guidance on the Preparation, Submission and Consideration of Tenders for Civil Engineering Contracts recommended for use in the United Kingdom (1983)Google Scholar
  12. 12.
    Banwell Committee. The Placing and Management of Contracts for Building and Civil Engineering Works. HMSO (1964)Google Scholar
  13. 13.
    C. Tassie. At the right price. Building (5 March 1982)Google Scholar
  14. 14.
    G. Smith. Tendering procedures scrutinised: Essex costs the alternatives. Chartered Quantity Surveyor (June 1981)Google Scholar
  15. 15.
    J.W. Ramus. Contract Practice for Quantity Surveyors. Heinemann (1981)Google Scholar
  16. Joint Contracts Tribunal for the Standard Form of Building Contract. Standard Form of Building Contract: Private with Quantities (1980)Google Scholar
  17. 17.
    D.F. Turner. Quantity Surveying Practice and Administration. Godwin (1983)Google Scholar
  18. 18.
    I.H. Seeley. Civil Engineering Quantities. Macmillan (1977)Google Scholar
  19. 19.
    P.H.P. Bennett. Standard Form of Building Contract — a study in relationships. Proceedings of Royal Institution of Chartered Surveyors, Quantity Surveyors Eleventh Triennial Conference (1978)Google Scholar
  20. 20.
    R.F. Fellows. 1980 JCT Standard Form of Building Contract: A Commentary for Students and Practitioners. Macmillan (1981)Google Scholar
  21. 21.
    Royal Institution of Chartered Surveyors. Refurbishment and Alteration Work: Quantity Surveying Documentation (1982)Google Scholar
  22. 22.
    Institution of Civil Engineers, Association of Consulting Engineers and Federation of Civil Engineering Contractors. Conditions of Contract for use in connection with Works of Civil Engineering Construction, Fifth edition (June 1973) (revised January 1979)Google Scholar
  23. General Conditions of Government Contracts for Building and Civil Engineering Works (GC/Wks 1) HMSO (November 1973)Google Scholar
  24. 24.
    G.A. Hughes. JCT, ICE and GC/Wks 1 compared. Chartered Quantity Surveyor (April 1979)Google Scholar
  25. General Conditions of Government Contracts for Building, Civil Engineering, Mechanical and Electrical Small Works (Form C1001) (1983)Google Scholar
  26. 26.
    J. Parris. The Standard Form of Building Contract JCT80. Granada (1982)Google Scholar
  27. 27.
    Royal Institution of Chartered Surveyors, Quantity Surveyors (Civil Engineering) Working Party. The ICE Conditions of Contract (1973)Google Scholar
  28. 28.
    Institute of Quantity Surveyors. A Report by the Civil Engineering Committee on Procedure in connection with the ICE Conditions of Contract (June 1973)Google Scholar
  29. 29.
    Association of Surveyors in Civil Engineering. The Fifth Edition Explained: Notes for guidance on the ICE Conditions of Contract (1979)Google Scholar
  30. 30.
    N. Royce. The 1980 JCT standard forms of contract. Chartered Institute of Building, Surveying Information Service No. 2 (1980)Google Scholar
  31. 31.
    Joint Contracts Tribunal. JCT Guide to the Standard Form of Building Contract 1980 Edition and to the JCT Nominated Sub-contract Documents. RIBA Publications (1980)Google Scholar
  32. 32.
    J.M. Neil. Construction Cost Estimating for Project Control. Prentice-Hall (1982)Google Scholar

Copyright information

© Ivor H. Seeley 1984

Authors and Affiliations

  1. 1.NottinghamUK

Personalised recommendations