Skip to main content

Part of the book series: Building and Surveying Series ((BASS))

Abstract

The reasons for undertaking planning have been outlined in Chapter 4. During a major construction project, the contractor will need to implement appropriate procedures in order to keep the master programme under constant review. Figure 6.1 indicates the relationships between the master programme, stage programmes, 4–6 weekly programmes and the weekly programming at site level.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Authors

Copyright information

© 1998 Brian Cooke and Peter Williams

About this chapter

Cite this chapter

Cooke, B., Williams, P. (1998). Planning During Construction. In: Construction Planning, Programming and Control. Building and Surveying Series. Palgrave, London. https://doi.org/10.1007/978-1-349-14293-4_6

Download citation

  • DOI: https://doi.org/10.1007/978-1-349-14293-4_6

  • Publisher Name: Palgrave, London

  • Print ISBN: 978-0-333-67758-2

  • Online ISBN: 978-1-349-14293-4

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics