Abstract
Cash funding requirements for the speculative developer/contractor differ considerably from those of the contractor being paid on interim certificates. Speculative developments involve a high degree of risk and a good understanding of the market — whether it be speculative housing or an office/factory development project.
This is a preview of subscription content, log in via an institution.
Preview
Unable to display preview. Download preview PDF.
Author information
Authors and Affiliations
Copyright information
© 1992 B. Cooke
About this chapter
Cite this chapter
Cooke, B. (1992). Funding for Speculative Contracts. In: Contract Planning and Contractual Procedures. Macmillan Building and Surveying Series. Palgrave, London. https://doi.org/10.1007/978-1-349-12964-5_6
Download citation
DOI: https://doi.org/10.1007/978-1-349-12964-5_6
Publisher Name: Palgrave, London
Print ISBN: 978-0-333-57760-8
Online ISBN: 978-1-349-12964-5
eBook Packages: EngineeringEngineering (R0)