Funding for Speculative Contracts

  • Chapter
  • 34 Accesses

Part of the book series: Macmillan Building and Surveying Series ((BASS))

Abstract

Cash funding requirements for the speculative developer/contractor differ considerably from those of the contractor being paid on interim certificates. Speculative developments involve a high degree of risk and a good understanding of the market — whether it be speculative housing or an office/factory development project.

This is a preview of subscription content, log in via an institution.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Author information

Authors and Affiliations

Authors

Copyright information

© 1992 B. Cooke

About this chapter

Cite this chapter

Cooke, B. (1992). Funding for Speculative Contracts. In: Contract Planning and Contractual Procedures. Macmillan Building and Surveying Series. Palgrave, London. https://doi.org/10.1007/978-1-349-12964-5_6

Download citation

  • DOI: https://doi.org/10.1007/978-1-349-12964-5_6

  • Publisher Name: Palgrave, London

  • Print ISBN: 978-0-333-57760-8

  • Online ISBN: 978-1-349-12964-5

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics