TESTING and MACHINE INSTALLATION

  • Michael Neidle

Abstract

All new installations and additions must be thoroughly checked and tested before being commissioned into service. This is to make sure that the installation is as safe as possible, and that the circuit is operating correctly — something which is often overlooked.

Keywords

Steam Rubber Neon Imped 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Copyright information

© Michael Neidle 1974

Authors and Affiliations

  • Michael Neidle
    • 1
  1. 1.Southall College of TechnologyUK

Personalised recommendations