Skip to main content

Techniques of Project Appraisal

  • Chapter
Project Evaluation
  • 74 Accesses

Abstract

In this paper, I attempt to bring into focus what I believe to be some of the important practical issues that face development planners in the field of project appraisal. I shall try, insofar as possible, to recognize the handicaps under which planners operate, most importantly the handicaps imposed by imperfect foresight and by the virtual necessity of decentralized decision-making. To elaborate briefly on these handicaps, I think we must take it for granted that our estimates of future costs and benefits (particularly the latter) are inevitably subject to a fairly wide margin of error, in the face of which it makes little sense to focus on subtleties aimed at discriminating accurately between investments that might have an expected yield of 101/2 percent and those that would yield only 10 percent per annum. As the first order of business we want to be able to distinguish the 10 percent investments from those yielding 5 or 15 percent, while looking forward hopefully to the day when we have so well solved the many problems of project evaluation that we can seriously face up to trying to distinguish 10 percent yields from those of 9 or 11 percent.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

eBook
USD 16.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 16.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Notes

  1. Robert H. Strotz, ‘The Social Rate of Time Discount’, mimeo., 1964, pp. 2–6.

    Google Scholar 

  2. Strotz here cites the results reported in George J. Stigler, Capital and Rates of Return in Manufacturing Industries, Princeton, N.J., 1963.

    Google Scholar 

  3. See A. K. Sen, ‘On Optimizing the Rate of Saving’, Economic Journal, September 1961.

    Google Scholar 

  4. Stephen A. Marglin, ‘The Social Rate of Discount and the Optimal Rate of Saving’, Quarterly Journal of Economics, February 1963.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Copyright information

© 1972 Arnold C. Harberger

About this chapter

Cite this chapter

Harberger, A.C. (1972). Techniques of Project Appraisal. In: Project Evaluation. Palgrave Macmillan, London. https://doi.org/10.1007/978-1-349-01653-2_1

Download citation

Publish with us

Policies and ethics