Abstract
If the company is following the path of PLM Vision, PLM Strategy and PLM Plan, then, by the time it gets to this stage, it will have an Implementation Strategy and an Implementation Plan. The latter will show the planned activities, their sequence and their timing.
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsAuthor information
Authors and Affiliations
Corresponding author
Rights and permissions
Copyright information
© 2011 Springer-Verlag London Limited
About this chapter
Cite this chapter
Stark, J. (2011). PLM Action. In: Product Lifecycle Management. Decision Engineering. Springer, London. https://doi.org/10.1007/978-0-85729-546-0_28
Download citation
DOI: https://doi.org/10.1007/978-0-85729-546-0_28
Published:
Publisher Name: Springer, London
Print ISBN: 978-0-85729-545-3
Online ISBN: 978-0-85729-546-0
eBook Packages: EngineeringEngineering (R0)