Long- and Short-Term Production Scheduling at Lkab's Kiruna Mine

  • Chapter
Handbook Of Operations Research In Natural Resources

LKAB’s Kiruna mine is an underground sublevel caving mine located above the Arctic circle in northern Sweden. The iron ore mine currently uses a longterm production scheduling model to strategically plan its ore extraction sequence. In this chapter, we describe how we modify this model to consider several different levels of time resolution in the short- versus long-term, and provide guidance for increasing model tractability. We demonstrate numerically the increase in schedule quality and model tractability as a result of these modifications.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 89.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 119.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Similar content being viewed by others

References

  • Almgren, T. (1994). An Approach to Long Range Production and Development Planning with Application to the Kiruna Mine, University of Technology, Sweden, LuleÇ», Doctoral Thesis Number 1994:143D.

    Google Scholar 

  • AMPL Optimization LLC. (2001). AMPL, Version 10.6.16. www.ampl.com.

  • Carlyle, M. and B.C. Eaves. (2001). Underground planning at Stillwater Mining Company, Interfaces 31(4): 50-60.

    Google Scholar 

  • Dagdelen, K., M. Kuchta, and E. Topal. (2002). Linear programming model applied to scheduling of iron ore production at the Kiruna Mine, Kiruna, Sweden, Transactions of the Society for Mining, Metallurgy, and Exploration 312: 194-198.

    Google Scholar 

  • Fourer, R., D. Gay, and B. W. Kernighan. (2003). AMPL: A Modeling Language for Mathematical Programming, Thompson Learning, Pacific Grove, CA.

    Google Scholar 

  • ILOG Corporation. (2003). CPLEX, Version 9.0. www.ilog.com.

  • Kuchta, M., A. Newman, and E. Topal. (2003). Production scheduling at LKAB's Kiruna Mine using mixed integer programming, Mining Engineering April, 35-40.

    Google Scholar 

  • Kuchta, M., A. Newman, and E. Topal. (2004). Implementing a production schedule at LKAB's Kiruna Mine, Interfaces 34(2): 124-134.

    Article  Google Scholar 

  • Martinez, M., A. Newman, and M. Kuchta. (2005). Using Decomposition to Optimize Long-and Short-Term Production Planning at an Underground Mine, Working Paper, Division of Economics and Business and Mining Engineering Department, Colorado School of Mines, Golden, CO, November.

    Google Scholar 

  • Newman, A. and M. Kuchta. (2007). Using aggregation to optimize long-term production planning at an underground mine, European Journal of Operational Research 176(2): 1205-1218.

    Article  Google Scholar 

  • Sarin, S. and J. West-Hansen. (2005). The long-term mine production scheduling problem, IIE Transactions 37(2): 109-121.

    Article  Google Scholar 

  • Smith, M.L. (1998). Optimizing short-term production schedules in surface mining: Integrating mine modeling software with AMPL/CPLEX, International Journal of Surface Mining 12(4): 149-155.

    Google Scholar 

  • Smith, M.L., Sheppard, I. and G. Karunatillake. (2003). Using MIP for strategic life-of-mine planning of the lead/zinc stream at Mount Isa Mines, in Proceedings, 31st International Symposium on the Application of Computers in the Mineral Industry, Capetown, South Africa: 465-474.

    Google Scholar 

  • Topal, E. (1998). Long and Short Term Production Scheduling of the Kiruna Iron Ore Mine, Kiruna, Sweden, Master of Science Thesis, Colorado School of Mines, Golden, CO.

    Google Scholar 

  • Topal, E. (2003). Advanced Underground Mine Scheduling using Mixed Integer Program-ming, Ph.D. Dissertation, Colorado School of Mines, Golden, CO.

    Google Scholar 

  • Trout, L.P. (1995). Underground mine production scheduling using mixed integer programming, in Proceedings, 25th International Symposium on the Application of Computers in the Mineral Industry, Brisbane, Australia: 395-400.

    Google Scholar 

  • Winkler, B.M. (1996). Using MILP to optimize period fix costs in complex mine sequencing and scheduling problems, in Proceedings, 26th International Symposium on the Application of Computers in the Mineral Industry, Pennsylvania State University, University Park, PA: 441-446.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2007 Springer Science+Business Media, LLC

About this chapter

Cite this chapter

Newman, A.M., Kuchta, M., Martinez, M. (2007). Long- and Short-Term Production Scheduling at Lkab's Kiruna Mine. In: Weintraub, A., Romero, C., Bjørndal, T., Epstein, R., Miranda, J. (eds) Handbook Of Operations Research In Natural Resources. International Series In Operations Research amp; Mana, vol 99. Springer, Boston, MA. https://doi.org/10.1007/978-0-387-71815-6_31

Download citation

Publish with us

Policies and ethics