Scheduling a set of tasks on a set of machines so as to yield an efficient schedule is a basic problem in computer science and operations research. Most of the research on this problem incorporates the potentially unrealistic assumption that communication between the different machines is instantaneous. In this paper, we remove this assumption and study the problem of network scheduling, where each job originates at some node of a network, and in order to be processed at another node must take the time to travel through the network to that node.
Our main contribution is to give approximation algorithms and hardness proofs for many of the fundamental problems in network scheduling. We consider two basic scheduling objectives: minimizing the makespan, and minimizing the average completion time. For the makespan we prove small constant factor hardness-to-approximate and approximation results for the most general forms of the problem. For the average completion time, we give a log-squared approximation algorithm; the techniques used in this approximation are somewhat general and have other applications. For example, we give the first non-trivial approximation algorithm to minimize the average completion time of a set of jobs with release dates on identical parallel machines.
Another contribution of this paper is to introduce an interesting class of questions about the design of networks to support specific computational tasks, and to give a polylogarithmic approximation algorithm for one of those problems; specifically, we give approximation algorithms to determine the minimum cost set of machines with which to augment a network so as to make possible a schedule of a certain target length.
Much of this work was done while the second and third authors were visiting Sandia National Labs, the third author was visiting DIMACS, and the second author was visiting Polytechnic University.
This work was performed under U.S. Department of Energy contract number DE-AC04-76DP00789.
Research partly supported by NSF Award CCR-9308701, a Walter Burke Research Initiation Award and a Dartmouth College Research Initiation Award.
Research partially supported by NSF Research Initiation Award CCR-9211494 and a grant from the New York State Science and Technology Foundation, through its Center for Advanced Technology in Telecommunications.
Preview
Unable to display preview. Download preview PDF.
Similar content being viewed by others
References
N. Alon, G. Kalai, M. Ricklin, and L. Stockmeyer. Lower bounds on the competitive ratio for mobile user tracking and distributed job scheduling. In Proceedings of the 33rd Annual Symposium on Foundations of Computer Science, pages 334–343, 1992.
B. Awerbuch, S. Kutten, and D.Peleg. Competetive distributed job scheduling. In Proceedings of the 24th Annual ACM Symposium on Theory of Computing, pages 571–580, 1992.
J.L. Bruno, E.G. Coffman, and R. Sethi. Scheduling independent tasks to reduce mean finishing time. Communications of the ACM, 17:382–387, 1974.
V. Chvátal. A greedy heuristic for the set-covering problem. Mathematics of Operations Research, 4(3):233–235, August 1979.
X. Deng, H. Liu, J. Long, and B. Xiao. Deterministic load balancing in computer networks. In Proceedings of 2nd IEEE Symposium on Parallel and Distributed Processing, 1992.
P. Fizzano, D. Karger, C. Stein, and J. Wein. Job scheduling in rings. In Proceedings of the 1994 ACM Symposium on Parallel Algorithms and Architectures, 1994.
R.L. Graham. Bounds for certain multiprocessor anomalies. Bell System Technical Journal, 45:1563–1581, 1966.
R.L. Graham. Bounds on multiprocessing anomalies. SIAM Journal of Applied Mathematics, 17:263–269, 1969.
M. Grotschel, C. L. Monma, and M. Stoer. Design of survivable networks. In Handbook in Operations Research and Management Science. 1992. To appear.
D. Gusfield. Bounds for naive multiple machine scheduling with release times and deadlines. Journal of Algorithms, 5:1–6, 1984.
L. Hall and D. B. Shmoys. Approximation schemes for constrained scheduling problems. In Proceedings of the 30th Annual Symposium on Foundations of Computer Science, pages 134–141. IEEE, October 1989.
D.S. Hochbaum and D.B. Shmoys. Using dual approximation algorithms for scheduling problems: theoretical and practical results. Journal of the ACM, 34:144–162, 1987.
D.S. Hochbaum and D.B. Shmoys. A polynomial approximation scheme for machine scheduling on uniform processors: using the dual approximation approach. SIAM Journal on Computing, 17:539–551, 1988.
W. Horn. Minimizing average flow time with parallel machines. Operations Research, 21:846–847, 1973.
E.L. Lawler, J.K. Lenstra, A.H.G. Rinooy Kan, and D.B. Shmoys. Sequencing and scheduling: Algorithms and complexity. In S.C. Graves, A.H.G. Rinnooy Kan, and P.H. Zipkin, editors, Handbooks in Operations Research and Management Science, Vol 4., Logistics of Production and Inventory, pages 445–522. North-Holland, 1993.
D. N. Lee, K. T. Medhi, J. L. Strand, R. G. Cox, and S. Chen. Solving large telecommunications network loading problems. AT&T Technical Journal, 68(3):48–56, 1989.
J.K. Lenstra, A.H.G. Rinnooy Kan, and P. Brucker. Complexity of machine scheduling problems. Annals of Discrete Mathematics, 1:343–362, 1977.
J.K. Lenstra, D.B. Shmoys, and É. Tardos. Approximation algorithms for scheduling unrelated parallel machines. Mathematical Programming, 46:259–271, 1990.
D. Peleg, 1992. Private communication.
S. Plotkin, D. B. Shmoys, and E. Tardos. Fast approximation algorithms for fractional packing and covering problems. In Proceedings of the 32nd Annual Symposium on Foundations of Computer Science, 1991. To appear.
P. Raghavan. Probabilistic construction of deterministic algorithms: approximating packing integer programs. Journal of Computer and System Sciences, 37:130–143, 1988.
P. Raghavan and C. D. Thompson. Randomized rounding: a technique for provably good algorithms and algorithmic proofs. Combinatorica, 7:365–374, 1987.
D. B. Shmoys, C. Stein, and J. Wein. Improved approximation algorithms for shop scheduling problems. In Proceedings of the 2nd ACM-SIAM Symposium on Discrete Algorithms, pages 148–157, January 1991. To appear in Siam J. Computing.
D. B. Shmoys and E. Tardos. Scheduling parallel machines with costs. In Proceedings of the 4th ACM-SIAM Symposium on Discrete Algorithms, pages 448–455, January 1993.
D. B. Shmoys, J. Wein, and D.P. Williamson. Scheduling parallel machines on-line. SIAM Journal on Computing, 1994. To appear.
Author information
Authors and Affiliations
Editor information
Rights and permissions
Copyright information
© 1994 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Phillips, C., Stein, C., Wein, J. (1994). Task scheduling in networks. In: Schmidt, E.M., Skyum, S. (eds) Algorithm Theory — SWAT '94. SWAT 1994. Lecture Notes in Computer Science, vol 824. Springer, Berlin, Heidelberg. https://doi.org/10.1007/3-540-58218-5_27
Download citation
DOI: https://doi.org/10.1007/3-540-58218-5_27
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-58218-2
Online ISBN: 978-3-540-48577-3
eBook Packages: Springer Book Archive