Abstract
Cost and schedule measures are the most important support activities for the success of a project; it provides the basis for process improvement and project management. This paper reports practical experiences on using EVM (Earned Value Management) and SPC(Statistical Process Control) in cost/ schedule measure. The analysis of experience data indicates the distributions of CPI(Cost Performance Index) and SPI(Schedule Performance Index) index are generally following the normal distribution. And consequently, it is reasonable and effective to employ SPC in EVM.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Putnam, L.H., Myers, W.: Industrial Strength Software-Effective Management Using Measure. IEEE Computer Society Press, Los Alamitos (1997)
Weller, E.F.: Practical applications of statistical process control. IEEE Software 17(3), 48–55 (2000)
Florac, W.A.: Statistical process control: Analyzing a space shuttle onboard software process. IEEE Software 17(4), 97–105 (2000)
Kan, S.H.: Metrics And Models In Software Quality Engineering. Addison-Wesley Publishing Company, Reading (2003)
Layman, B., Curtis, B., Puffer, J., Webet, C.: Solving the Challenge of Quantitative Management, Section 4: Problems in the use of Control Charts. SEPG 2002 QM Tutorial, Phoenix, Arizon, Februay 18-21 (2002)
Florac, W.A.: Measuring software process- Statistical process control for software process improvement. Addson-Wesley, Reading (1999)
Jalote, P.: CMM in Practice – Processes for executing software projects at Infosys. SEI Series on Software Engineering. Addison-Wesley Longman, Amsterdam (1999)
Lipke, W.: Statistical Process Control of Project Performance. CrossTalk, The Journal of Defense Software Engineering 15(3), 15–18 (2002)
Lipke, W.: A Study of the Normality of Earned Value Management Indicators. The Measurable News (December 2002)
Departments of the Air Force, the Army, the Navy, and the Defense Logistic Agency. Cost/Schedule Control Systems Criteria Joint Implementation Guide (1980)
Department of the Air Force. Air Force Systems Command. Software Management Indicators (1986)
Wang, Q., Li, M.S.: Software Process Management: Practices in China. In: Li, M., Boehm, B., Osterweil, L.J. (eds.) SPW 2005. LNCS, vol. 3840, Springer, Heidelberg (2006)
Wang, Q., Jiang, N.: BSR: A Statistic-based Approach for Establishing and Refining Software Process Performance Baseline. In: The 28th International Conference on Software Engineering (ICSE 2006), Shanghai, May 20-28 (accepted, 2006)
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2006 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Wang, Q., Jiang, N., Gou, L., Che, M., Zhang, R. (2006). Practical Experiences of Cost/Schedule Measure Through Earned Value Management and Statistical Process Control. In: Wang, Q., Pfahl, D., Raffo, D.M., Wernick, P. (eds) Software Process Change. SPW 2006. Lecture Notes in Computer Science, vol 3966. Springer, Berlin, Heidelberg. https://doi.org/10.1007/11754305_38
Download citation
DOI: https://doi.org/10.1007/11754305_38
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-34199-4
Online ISBN: 978-3-540-34201-4
eBook Packages: Computer ScienceComputer Science (R0)