Skip to main content

Development of a BSC-Based Evaluation Framework for e-Manufacturing Project

  • Conference paper
Computational Science and Its Applications – ICCSA 2005 (ICCSA 2005)

Part of the book series: Lecture Notes in Computer Science ((LNTCS,volume 3482))

Included in the following conference series:

  • 1722 Accesses

Abstract

Recently, in order to swiftly satisfy the various product demands by customers reinforced collaboration among industries or business types as well as increased outsourcing have emerged as indispensable constitutive elements of modern manufacturing. An e-Manufacturing pilot project for supporting design collaboration of a domestic mould company is now underway. To drive efficiently the project, different evaluation frameworks per stakeholder in the e-Manufacturing project are required. In this study, we proposed a unified evaluation template which is composed of two viewpoints (user and operator) and three steps (pre-evaluation, operation evaluation and post evaluation). Particularly, we proposed the evaluation framework for contractor mould companies from the user’s viewpoint using BSC concept.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Similar content being viewed by others

References

  1. Kaplan, R.S., Norton, D.P.: The balanced scorecard: measures that drive performance. Harvard Business Review 70(1), 71–79 (1992)

    Google Scholar 

  2. Kaplan, R.S., Norton, D.P.: Putting the balanced scorecard to work. Harvard Business Review 71(5), 134–142 (1993)

    Google Scholar 

  3. Kaplan, R.S., Norton, D.P.: Using the balanced scorecard as a strategic management system. Harvard Business Review 74(1), 75–85 (1996)

    Google Scholar 

  4. Merchant, K.: Control in Business Organization. Harvard Graduate School of Business, MA (1985)

    Google Scholar 

  5. Kaplan, R.S., Norton, D.P.: The Balanced Scorecard: Translating Strategy into Action. Harvard Business School Press, Boston (1996)

    Google Scholar 

  6. Van Veen-Dirks, P., Wijn, M.: Strategic Control: Meshing Critical Success Factors with the Balanced Scorecard. Long Range Planning 35, 407–427 (2002)

    Article  Google Scholar 

  7. Ahn, H.: Applying the Balanced Scorecard Concept: An Experience Report. Long Range Planning 34, 441–461 (2001)

    Article  Google Scholar 

  8. Irwin, D.: Strategy mapping in the public sector. Long Range Planning 35, 637–647 (2002)

    Article  Google Scholar 

  9. Martinsons, M., Davison, R., Tse, D.: The balanced scorecard: a foundation for the strategic management of information systems. Decision Support Systems 25, 71–88 (1999)

    Article  Google Scholar 

  10. Brynjolfsson, E., Renshaw, A.A., Alstyne, M.V.: The matrix of change. Sloan Management Review 38(2), 37–54 (1997)

    Google Scholar 

  11. Rainer, R.K., Watson, H.J.: What does it take for successful executive information systems? Decision Support Systems 14(2), 147–156 (1995)

    Article  Google Scholar 

  12. Lee, R.S., Chen, Y.M., Cheng, H.Y., Kuo, M.D.: A Framework of a concurrent process planning system for mold manufacturing. Computer Integration Manufacturing System 11(3), 171–190 (1998)

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2005 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Cho, Y., Kim, W., Leem, C.S., Choi, H. (2005). Development of a BSC-Based Evaluation Framework for e-Manufacturing Project. In: Gervasi, O., et al. Computational Science and Its Applications – ICCSA 2005. ICCSA 2005. Lecture Notes in Computer Science, vol 3482. Springer, Berlin, Heidelberg. https://doi.org/10.1007/11424857_137

Download citation

  • DOI: https://doi.org/10.1007/11424857_137

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-540-25862-9

  • Online ISBN: 978-3-540-32045-6

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics