Abstract
A key requirement for a successful facility planning and design is to become suitable for new use as well as to be adaptable for new products, technologies or capacities. The software solution “Workbench” is designed for an Information Infrastructure System for the planning of large logistics networks as well as for the network structures of the facilities in an enterprise. The “Workbench” ensures a better information flow and basis for Factory planning and enables planners without great expert planning knowledge.
Chapter PDF
References
Beckmann, H. (1996) Theorie einer evolutionären Logistik-Planung. Praxiswissen, Dortmund
Beckmann, H. (2000) Supply Chain Method Handbook. Praxiswissen, Dortmund
Dunne, J.A., Williams, R.J., Martinez N.D. (2002) Network structure and biodiversity loss in food webs: Robustness increases with connectenance, Ecology Letters 5, pp 558–567
Ebel, H., Mielsch, L.-I., Bornholdt, S. (2002) Scale-free topology of e-mail networks, Phys.Rev E 66, 035103
Fang, D. (1996) Entwicklung eines wissensbasierten Assistenzsystems für die Planung von Lagersystemen. Reihe Fabrikorganisation. Praxiswissen, Dortmund
Fox, J.J., Hill C.C. (2001) From topology to dynamics in biochiamical net-works, Chaos 11; pp 809–815
Kühling, M. (2000) Gestaltung der Produktionsorganisation mit Modell-und Methodenbausteinen. Dissertation Universität Dortmund
Kuhn A. et. al. (2002) Endbericht “fast ramp up” Schneller Produktionsanlauf von Serienprodukten BMBF Förderkennzeichen 02PD9001; Verlag Praxiswissen, Dortmund, ISBN Nr. 3-932-775-92-9
Kuhn, A. (1995) Prozessketten in der Logistik. Entwicklungstrends und Umsetzungsstrategien, Praxiswissen, Dortmund
Sonderforschungsbereich SFG 559 (2004) http://www.sfb559.uni-dortmund.de (25.09.2004)
Wiesinger G., Housein G. (2002c) Management von Wissen, Qualifikation und Beziehungen im Anlauf Wissensmanagement und Personalqualifikation als Garant für einen schnellen Produktionsanlauf von Serienprodukten Artikel zum Thema Ramp-Up aus der WT-Online Heft 10
Wiesinger G., Laakmann F., Guenther S. (2002a) Collaborative Knowledge Workbench for Supply Chain Design Projects. Proc. of the 6th International Conference on Engineering Design and Automation; Hawaii, USA
Wiesinger G., Laakmann F., Hieber R. (2002) Supply Chain Engineering and the use of a supporting knowledge Management Application. In Arai, E. (ed) Preproceedings of DIISM 2002, Osaka University Press, Osaka, Japan
Wiesinger G. (2002b) Leitartikel: Schneller Produktionsanlauf von Serienprodukten Wettbewerbsvorteile durch ein anforderungsgerechtes Anlaufmanagement; WT-Online Heft 10
Wiesinger, G., Giourai H. (2001) Potential for fast ramp-up Processes in Production Systems IML annual report.
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2005 International Federation for Information Processing
About this paper
Cite this paper
Wiesinger, G.F. (2005). Workbench: A Planning Tool for Faster Factory Optimization. In: Bernus, P., Fox, M. (eds) Knowledge Sharing in the Integrated Enterprise. DIISM ICEIMT 2004 2004. IFIP — The International Federation for Information Processing, vol 183. Springer, Boston, MA. https://doi.org/10.1007/0-387-29766-9_39
Download citation
DOI: https://doi.org/10.1007/0-387-29766-9_39
Publisher Name: Springer, Boston, MA
Print ISBN: 978-0-387-26608-4
Online ISBN: 978-0-387-29766-8
eBook Packages: Computer ScienceComputer Science (R0)