This paper provides an analytical method for evaluating production rates in serial lines having finite buffers and unreliable machines with arbitrary unimodal distributions of up- and downtime. Provided that each buffer is capable of accommodating at least one downtime of all machines in the system, we show that the production rate (a) is relatively insensitive to the type of up- and downtime distributions and (b) can be approximated by a linear function of their coefficients of variation. The results obtained are verified using Weibull, gamma, and log-normal probability distributions of up- and downtime.
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsPreview
Unable to display preview. Download preview PDF.
References
Altiok, T. (1985). Production lines with phase-type operation and repair times and finite buffers. International Journal of Production Research, 23:489–498.
Altiok, T. (1989). Approximate analysis of queues in series with phase-type service times and blocking. Operations Research, 37:601–610.
Altiok, T. (1997). Performance Analysis of Manufacturing Systems. Springer.
Altiok, T. and Ranjan, R. (1989). Analysis of Production Lines with general service times and finite buffers: A two-node decomposition approach. Engineering Costs and Production Economics, 17:155–165.
Le Bihan, H. and Dallery, Y. (2000). A robust decomposition method for the analysis of production lines with unreliable machines and finite buffers. Annals of Operations Research, 93:265–297.
Buxey, G.M., Slack, N.D., and Wild, R. (1973). Production flow line systems design—A review. AIIE Transactions, 5:37–48.
Buzacott, J.A. (1967). Automatic transfer lines with buffer stocks. International Journal of Production Research, 5:182–200.
Buzacott, J.A. and Hanifin, L.E. (1978). Models of automatic transfer lines with inventory banks: A review and comparison. AIIE Transactions, 10:197–207.
Buzacott, J.A. and Kostelski, D. (1987). Matrix-geometric and recursive algorithm solution of a two-stage unreliable flow line. IIE Transactions, 19:429–438.
Buzacott, J.A. and Shanthikumar, J.G. (1993). Stochastic Models of Manufacturing Systems. Prentice Hall.
Chiang, S.-Y., Kuo, C.-T., and Meerkov, S.M. (1998). Bottlenecks in Markovian production lines. IEEE Transactions on Robotics and Automation, 14:352–359.
Chiang, S.-Y., Kuo, C.-T., and Meerkov, S.M. (2000). DT-bottleneck in serial production lines: Theory and application. IEEE Transactions on Robotics and Automation, 16:567–580.
Chiang, S.-Y., Kuo, C.-T., and Meerkov, S.M. (2001). c-bottleneck in serial production lines: Identification and application. Mathematical Problems in Engineering, 6:543–578.
Choong, Y.F. and Gershwin, S.B. (1987). A decomposition method for the approximate evaluation of capacitated transfer lines with unreliable machines and random processing times. IIE Transactions, 19:150–159.
Dallery, Y. and Le Bihan, H. (1999). An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers. International Journal of Production Research, 37:1093–1117.
Dallery, Y., David, R., and Xie, X.-L. (1988). An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers. IIE Transactions, 20:280–283.
Dallery, Y., David, R., and Xie, X.-L. (1989). Approximate analysis of transfer lines with unreliable machines and finite buffers. IEEE Transactions on Automatic Control, 34:943–953.
Dallery, Y. and Gershwin, S.B. (1992). Manufacturing flow line systems: A review of models and analytical results. Queuing Systems, 12:3–94.
Enginarlar, E., Li, J., Meerkov, S.M., and Zhang, R.Q. (2002). Buffer capacity to accommodating machine downtime in serial production lines. International Journal of Production Research, 40:601–624.
Gershwin, S.B. (1994). Manufacturing Systems Engineering. Prentice Hall.
Gershwin, S.B. and Berman, O. (1981). Analysis of transfer lines consisting of two unreliable machines and random processing times and finite storage buffers. AIIE Transactions, 13:2–11.
Gershwin, S.B. (1987). An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking. Operations Research, 35:291–305.
Glassey, C.R. and Hong, Y. (1993). Analysis of behavior of an unreliable n-stage transfer line with (n − 1) inter-storage buffers. International Journal of Production Research, 31:519–530.
Hillier, F.S. and So, K.C. (1991a). The effect of the coefficient of variation of operation times on the allocation of storage space in production line systems. IIE Transactions, 23:198–206.
Hillier, F.S. and So, K.C. (1991b). The effect of machine breakdowns and internal storage on the performance of production line systems. International Journal of Production Research, 29:2043–2055.
Inman, R.R. (1999). De Koster Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems. Production and Operation Management, 8:409–432.
Jacobs, D.A. and Meerkov, S.M. (1995a). A system-theoretic property of serial production lines: Improvability. International Journal of System Science, 26:95–137.
Jacobs, D.A. and Meerkov, S.M. (1995b). Mathematical theory of improvability for production systems. Mathematical Problems in Engineering, 1:95–137.
Jafari, M. and Shanthikumar, J.G. (1987). An approximate model of multistage automatic transfer lines with possible scrapping of workspieces. IIE Transactions, 19:252–265.
Koenigsberg, E. (1959). Production lines and internal storage—A review. Management Sciences, 5:410–433.
De Koster, M.B.M. (1987). Estimation of the line efficiency by aggregation. International Journal of Production Research, 25:615–626.
De Koster, M.B.M. (1988). An improved algorithm to approximate the behavior of flow lines. International Journal of Production Research, 26:691–700.
Li, J. and Meerkov, S.M. (2003). On the coefficients of variation of up-and downtime in manufacturing equipment. Control Group Report CGR 03-14, Forthcoming in: IIE Transactions on Quality and Reliability Engineering.
Lim, J.-T., Meerkov, S.M., and Top, F. (1990). Homogeneous, asymptotically reliable serial production lines: Theory and a case study. IEEE Transactions on Automatic Control, 35:524–534.
Liu, X.-G. and Buzacott, J.A. (1989). A zero-buffer equivalence technique for decomposing queueing networks with blocking. In: Queueing Networks with Blocking (H.G. Perros and T. Altiok, eds.), pages 87–104, North-Holland.
Papadopoulos, H.T. and Heavey, C. (1996). Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines. European Journal of Operational Research, 92:1–27.
Powell, S.G. (1994). Buffer allocation in unbalanced three-station lines. International Journal of Production Research, 32:2201–2217.
Sadr, J. and Malhame, R.P. (2003). Bottleneck identification and maximal throughput evaluation in unreliable transfer lines. Proceedings of 4th Aegean International Conference on Analysis of Manufacturing Systems, pages 41–49, Samos Island, Greece.
Sevast'yanov, S.T. (1962). Influence of storage bin capacity on the average standstill time of a production line. Theory of Probability Applications, 429–438.
Shanthikumar, J.G. and Yao, D.D. (1989). Monotonicity and concavity properties in cyclic queueing networks with finite buffers. In: Queueing Networks with Blocking (H.G. Perros and T. Altiok, eds.), pages 325–345, North-Holland.
Sheskin, T.J. (1976). Allocation of interstate storage along an automatic production line. AIIE Transaction, 8:146–152.
Soyster, A.L., Schmidt, J.W., and Rohrer, M.W. (1979). Allocations of buffer capacities for a class of fixed cycle production systems. AIIE Transactions, 11:140–146.
Tan, T. and Yeralan, S. (1997). A decomposition model for continuous materials flow production systems. International Journal of Production Research, 35:2759–2772.
Tempelmeier, H. (2003). Practical considerations in the optimization of flow production systems. International Journal of Production Research, 41:149–170.
Tempelmeier, H. and Burger, M. (2001). Performance evaluation of unbalanced flow line with general distributed processing times, failures and imperfect production. IIE Transactions, 33:293–302.
Terracol, C. and David, R. (1987). An aggregation technique for performance evaluation of transfer lines with unreliable machine and finite buffers. Proceedings of IEEE International Conference on Robotics and Automation, pages 1333–1338.
Vidalis, M.I. and Papadopoulos, H.T. (1999). Markovian analysis of production lines with coxian-2 service times. International Transactions in Operational Research, 6:495–524.
Viswanadham, N. and Narahari, Y. (1992). Performance Modeling of Automated Manufacturing System, Practice Hall.
Wijingaard, J. (1979). The effect of interstate buffer storage on the output of two unreliable production units in series with different production rates. AIIE Transactions, 11:42–47.
Yamashita, H. and Altiok, T. (1998). Buffer capacity allocation for a desired throughput of production lines. IIE Transactions, 30:883–891.
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2005 Springer Science+Business Media, Inc.
About this chapter
Cite this chapter
Li, J., Meerkov, S.M. (2005). Evaluation of Throughput in Serial Production Lines with Non-Exponential Machines. In: Boukas, E.K., Malhamé, R.P. (eds) Analysis, Control and Optimization of Complex Dynamic Systems. Springer, Boston, MA. https://doi.org/10.1007/0-387-25477-3_4
Download citation
DOI: https://doi.org/10.1007/0-387-25477-3_4
Publisher Name: Springer, Boston, MA
Print ISBN: 978-0-387-25475-3
Online ISBN: 978-0-387-25477-7
eBook Packages: Business and EconomicsBusiness and Management (R0)