Advertisement

Design Methods and Project Management

Part of the Astronomy and Astrophysics Library book series (AAL)

Keywords

Project Management Critical Path Aperture Diameter Space Observatory Primary Mirror 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. [1]
    Presentation from the Office of the Comptroller, reproduced from. NASA Systems Engineering Handbook, SP-610S, U.S. GPO, 1995, section 3.2.Google Scholar
  2. [2]
    Stockman, H.S., ed., The Next Generation Space Telescope — Visiting a Time When Galaxies Were Young, AURA, p. 149, 1997.Google Scholar
  3. [3]
    Gemini Project Newsletter, No. 6, p. 6, 1993.Google Scholar
  4. [4]
    Nelson, J. and Mast, T., Giant optical devices, in Proc. of Bäckaskog Workshop on Extremely Large Telescopes, Lund Univ. & ESO, 1999.Google Scholar
  5. [5]
    Schmidt, T.H. and Rucks, P., Telescope costs and cost reduction, SPIE Proc., Vol. 2871, p. 635, 1997.Google Scholar
  6. [6]
    Horak, J., Cost estimating relationship study, Report TR-9114-01, Technomics, Inc., 1993.Google Scholar
  7. [7]
    Bely, P., et al, Implications of the mid-infrared capability for NGST, NGST Monograph 3, NGST Project Office, Goddard Space Flight Center, 1998.Google Scholar
  8. [8]
    Benn, C.R. and Sánchez, S.F., Scientific impact of large telescopes, PASP, Vol. 113, p. 385, 2001.CrossRefADSGoogle Scholar
  9. [9]
    Leverington, D., Optical telescopes — biggest is best?, Nature, Vol. 385, p. 196, 1997, Star-gazing funds should come down to Earth, Nature, Vol. 387, p. 12, 1997.CrossRefADSGoogle Scholar
  10. [10]
    Benn C. and Ellison, S., La Palma night-sky brightness, La Palma Technical Note No. 115, 1998.Google Scholar
  11. [11]
    Hubble Space Telescope Project, ST ICD-26, NASA Goddard Space Flight Center.Google Scholar
  12. [12]
    NASA, Systems Engineering Handbook, SP-610S, U.S. GPO, 1995, section 4.5.Google Scholar
  13. [14]
    Kerzner, H., Project Management, A Systems Approach to Planning, Scheduling and Controlling, Van Nostrand Reinhold, 1995, p. 877.Google Scholar
  14. [15]
    Wong, R., Cost modeling, in Space Mission Analysis and Design, Larson W.J. and Wertz J.R., eds., Kluwer, 1992, p. 734.Google Scholar

Bibliography

  1. Armstrong, J. E. and Sage, A. P., Introduction to Systems Engineering, J. Wiley & Sons, 1995.Google Scholar
  2. Augustine, N.R., Augustine’s Laws, American Institute of Aeronautics and Astronautics, 1983.Google Scholar
  3. Badiru, A.B. and Pulat, P.S., Comprehensive Project Management: Integrating Optimization Models, Management Principles, and Computers, Prenctice-Hall, 1995.Google Scholar
  4. Barter, N.J., ed., TRW Space Data, TRW Inc., 1999.Google Scholar
  5. Blanchard, B.S., Systems Engineering and Analysis, Prentice-Hall, 1998.Google Scholar
  6. Harwit, M., Cosmic Discovery, Basic Books Inc., 1981.Google Scholar
  7. Kerzner, H., Project Management, A Systems Approach to Planning, Scheduling and Controlling, Van Nostrand Reinhold, 1995.Google Scholar
  8. Larson W.J. and Wertz J.R., ed., Space Mission Analysis and Design, Kluwer Academic Publishers, 1992.Google Scholar
  9. Modell, M.E., A Professional’s Guide to Systems Analysis, McGraw-Hill, 1996.Google Scholar
  10. NASA, Systems Engineering Handbook, SP-610S, U.S. GPO, 1995.Google Scholar
  11. Sarafin, T.P. and Larson, W.J., eds., Spacecraft Structures and Mechanisms — from Concept to Launch, Kluwer Academic Publishers, 1998.Google Scholar

Copyright information

© Springer-Verlag New York, Inc. 2003

Personalised recommendations