This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsPreview
Unable to display preview. Download preview PDF.
References
Lewis, K.D., and Arthur, L.C., Spacecraft integration and test, in Spacecraft Structures and Mechanisms — From Concept to Launch, Sarafin, T.P. and Larson, W.J., eds., Kluwer Academic Publishers, 1998, p. 819.
Menzel, M., Triebes, K., Leary, D., and Krim, M., A Strawman Verification, Integration and Test Program for NGST, NGST Monograph 4, NASA, Goddard Space Flight Center, 2000.
Bibliography
Geballe, T. and Gillett, F., Gemini system verification, Gemini Newsletter No. 18, 1999.
Gilmozzi, R., The first six months of VLT Science operations, ESO Messenger, No. 98, p. 25, 1999.
Gray, P.M., Assembly and integration to first light of the four VLT telescopes, SPIE Proc., Vol. 4004, p. 1, 2000.
Menzel, M., Triebes, K., Leary, D., and Krim, M., A Strawman Verification, Integration and Test Program for NGST, NGST Monograph 4, NASA, Goddard Space Flight Center, 2000.
Sarafin, T.P. and Larson, W.J., eds., Spacecraft Structures and Mechanisms — From Concept to Launch, Kluwer Academic Publishers, 1998.
Wallander, A., Spyromilio, J., and Wirenstrand, K., Commissioning VLT unit telescopes: methods and results, SPIE Proc., Vol. 4004, p. 234, 2000.
Rights and permissions
Copyright information
© 2003 Springer-Verlag New York, Inc.
About this chapter
Cite this chapter
(2003). Integration and Verification. In: The Design and Construction of Large Optical Telescopes. Astronomy and Astrophysics Library. Springer, New York, NY. https://doi.org/10.1007/0-387-22606-0_11
Download citation
DOI: https://doi.org/10.1007/0-387-22606-0_11
Publisher Name: Springer, New York, NY
Print ISBN: 978-0-387-95512-4
Online ISBN: 978-0-387-22606-4
eBook Packages: Springer Book Archive