Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
I. Burnstein, T. Suwanassart, and C. Carlson, “Developing a testing maturity model: part I,” CrossTalk: Journal of Defense Software Engineering. Vol. 9,No. 8, 1996, pp. 21–24
I. Burnstein, T. Suwanassart, and C. Carlson, “Developing A testing maturity model: part II,” CrossTalk: Journal of Defense Software Engineering. Vol. 9,No. 9, 1996, pp. 19–26.
I. Burnstein, A. Homyen, R. Grom, C. R. Carlson, “A model for assessing testing process maturity,” CrossTalk: Journal of Department of Defense Software Engineering, Vol. 11,No. 11, Nov. 1998, pp. 26–30.
I. Burnstein, A. Homyen, T. Suwanassart, G. Saxena, R. Grom, “Using the testing maturity model to assess and improve your software testing process,” Proc. of International Quality Week Conf. (QW’99), San Jose, CA, May 1999.
I. Burnstein, A. Homyen, T, Suwanassart, G. Saxena, R. Grom, “A testing maturity model for software test process assessment and improvement,” Software Quality Professional (American Society for Quality), Vol. 1,No. 4, Sept. 1999, pp. 8–21.
M. Paulk, C. Weber, B. Curtis, and M. Chrissis, The Capability Maturity Model, Addison-Wesley, Reading, MA, 1995.
Software Engineering Institute, www.sei.cmu.edu/cmmi/publications
F. Coallier, “How ISO 9001 fits into the software world,” IEEE Software, Vol. 11,No. 1, 1994, pp. 98–100.
A. Bicego, P. Kuvaja, “BOOTSTRAP: Europe’s assessment method,” IEEE Software, Vol. 10,No. 3, 1993, pp. 93–95.
M. Paulk, M. Konrad, “An overview of ISO’s SPICE project,” American Programmer, Vol. 7,No. 2, 1994, pp. 16–20.
M. Paulk, B. Curtis, M. Chrissis, and C. Weber. “Capability maturity model, version 1.1,” IEEE Software, Vol. 10,No. 4, 1993, pp. 18–27.
M. Paulk, C. Weber, S. Garcia, M. Chrissis, and M. Bush, “ Key practices of the capability maturity model, version 1.1,” Technical Report, CMU/SEI-93-TR-25, 1993, Software Engineering Institute, Pittsburgh, PA.
D. Gelperin, B. Hetzel, “The growth of software testing,” Communications of the Association of Computing Machinery, Vol. 31,No. 6, 1988, pp. 687–695.
J. Durant, “ Software testing practices survey report,” Technical Report, TR5-93, Software Practices Research Center, 1993.
B. Beizer, Software Testing Techniques, second edition, Van Nostrand Reinhold, New York, 1990.
D. Gelperin, A. Hayashi, “How to support better software testing,” Application Trends, May 1996, pp. 42–48.
D. Gelperin, “What’s your testability maturity?” Application Trends, May 1996, pp. 50–53.
T. Koomen, M. Pol, “ Improvement of the test process using TPI,” Technical Report, IQUIP Informatica B.V., Diemen, The Netherlands, 1998, http://www.iquip.nl.
T. Koomen, M. Pol, Test Process Improvement, Addison-Wesley, Reading, MA, 1999.
A. Clouse, C. Wells, “Transitioning from EIA/IS-731 to CMMI,” CrossTalk: Journal of Department of Defense Software Engineering, Vol. 13,No. 7, July 2000, pp. 15–20.
S. Shrum, “Choosing a CMMI model representation,” CrossTalk: Journal of Department of Defense Software Engineering, Vol. 13,No. 7, July 2000, pp. 6–7.
International Organization for Standardization (ISO), ISO/IEC Software Process Assessment Working Draft-Part 3: Rating processes, version 1.00; Part 5: Construction, selection and use of assessment instruments and tools, version 1.00; Part 7: Guide for use in process improvement, version 1.00, International Organization for Standardization, Geneva, 1995.
D. Zubrow, W. Hayes, J. Siegel, D. Goldenson, “ Maturity questionnaire,” Technical Report, CMU/SEI-94-SR-7, Software Engineering Institute, Pittsburgh, PA, 1994.
S. Masters, C. Bothwell, “ A CMM appraisal framework, version 1.0,” Technical Report, CMU/SEI-95-TR-001, Software Engineering Institute, Pittsburgh, PA, 1995.
A. Homyen, “ An assessment model to determine test process maturity,” Ph.D. thesis, Illinois Institute of Technology, Chicago, IL, 1998.
J. Hearns, S. Garcia, “Automated test team management—it works!” Proc. of the 10th Software Eng. Process Group Conference (SEPG’98), 6–9 March, Chicago, IL, 1998.
W. Humphrey, W. Sweet, “ A method for assessing the software engineering capability of contractors,” Technical Report, CMU/SEI-87-TR-23, Software Engineering Institute, Pittsburgh, PA, 1987.
J. Puffer, A. Litter, “Action planning,” IEEE Software Engineering Technical Council Newsletter, Vol. 15,No. 2, 1997, pp. 7–10.
R. Grom, “ Report on a TMM assessment support tool,” Technical Report, Illinois Institute of Technology, Chicago, IL, 1998.
C. Cook, M. Visconti, “ New and improved documentation model,” Technical Report, Oregon State University, 1996.
K. El Emam, D. Goldenson, L. Briand, P. Marshall, “Interrater agreement in SPICE-based assessments: some preliminary reports,” Proc. Fourth International Conference on the Software Process, Brighton, UK, 1996, pp. 149–156.
G. Saxena, “ A framework for building and evaluating process maturity models,” Ph.D. thesis, Illinois Institute of Technology, Chicago, IL, 1999.
J. Weszka, P. Babel, J. Ferguson, “CMMI: evolutionary path to enterprise process improvement,” CrossTalk: Journal of Department of Defense Software Engineering, Vol. 13,No. 7, July 2000, pp. 8–11.
CMMI Product Development Team, “CMMI for systems engineering/software engineering, version 1.02 (CMMI-SE/SW, V1.02) staged representation,” Technical Report, CMU/SEI-2000TR-018, ESC-TR-2000-018, Software Engineering Institute, Nov. 2000.
D. Kitson, “An emerging international standard for software process assessment,” Proc. IEEE Third International Software Engineering Standards Symposium and Forum, Walnut Creek, CA, June 1999.
S. Garcia, “Evolving improvement paradigms: Capability Maturity Models and ISO/IEC 15504 (PDTR),” Software Process Improvement and Practice, Vol. 3,No. 1, 1998.
International Organization for Standardization (ISO), “ISO/IEC 12207: Information Technology-Software Life Cycle Processes,” 1995.
J. Moore, “ ISO 12207 and related software life cycle standards,” http://www.acm.org.tsc/lifecycle.html.
R. Kehoe, A. Jarvis, ISO-9000-3, Springer-Verlag, New York, 1995.
I. Burnstein, T. Suwanassart, private correspondence, 2001.
J. Hook, “ Evaluation of the TMM questionnaire,” Technical Report, Illinois Institute of Technology, Chicago, IL, 1997.
K. Olsen, P. Stall Vinje, “ Using the testing maturity model in practical test-planning and postevaluation,” EuroSTAR98 Conference, Munich, Germany, 1998.
I. Burnstein, L. Miller (President, Midwest Software Testing Lab, Inc.), private correspondence, 2000–2001.
H. Tran, “ A procedure on how to conduct a testing maturity assessment on a software development organization using the TMM assessment methodology,” M.S. thesis, University of Minnesota, Rochester, MN, 2001.
L. Zells, “Learning from Japanese TQM applications to software engineering,” Total Qualty Managment for Software, G. Schulmeyer, J. McManus, eds., Van Nostrand Reinhold, New York, 1992.
K. El Emam, B. Shostak, N. Madhavji, “Implementing concepts from the personal software process in an industrial setting,” Proc. Fourth International Conference on the Software Process, Improvement, and Practice, Brighton, UK, 1996, pp. 117–130.
Rights and permissions
Copyright information
© 2003 Springer-Verlag New York, Inc.
About this chapter
Cite this chapter
(2003). The Testing Maturity Model and Test Process Assessment. In: Practical Software Testing. Springer Professional Computing. Springer, New York, NY. https://doi.org/10.1007/0-387-21658-8_16
Download citation
DOI: https://doi.org/10.1007/0-387-21658-8_16
Publisher Name: Springer, New York, NY
Print ISBN: 978-0-387-95131-7
Online ISBN: 978-0-387-21658-4
eBook Packages: Springer Book Archive