Advertisement

Life Cycle Costing Model for Equipment for Indian Naval Shipbuilding Programme

  • Alok BhagwatEmail author
  • Pradnya C. Chitrao
Conference paper
  • 37 Downloads
Part of the Advances in Intelligent Systems and Computing book series (AISC, volume 1077)

Abstract

Indian Navy has embarked upon an ambitious fleet expansion and modernization programme to be a ‘modern and multi-dimensional Navy’. Further, India has leapfrogged into the league of select few nations capable of building Aircraft Carrier and Nuclear Submarine. Indian Navy has plans to induct 200 new ships by year 2030. A majority of these platforms will see indigenous design. While the warships and submarines have indigenous design, a large volume of equipment and systems going in the platforms are imported. The Indian industry is gearing up for indigenous development of these equipment and is competing with foreign equipment manufacturers for winning the contracts. Whereas, the International navies e.g. USA, Canada, Australia, etc., evaluate the competing suppliers on the basis of ‘Total Ownership Cost’ or ‘Life Cycle Cost (LCC)’ of an equipment, in Indian Navy, the contracts are decided on the equipment acquisition cost alone. This is an erroneous process as the ‘Operation & Maintenance (O&M) costs’ of an equipment is significant given the equipment life cycle of 25–30 years. The O&M costs are much lower for an indigenously sourced equipment as compared to an imported equipment. Therefore, an indigenous supplier is at a disadvantage on one hand and the country pays up higher amounts in the operation cycle of the ships to foreign equipment suppliers on the other hand. The research study aims to develop a LCC model. The authors have undertaken a study towards this. The study has been undertaken by conducting unstructured interviews with senior personnel at Mumbai associated with naval shipbuilding and operations. The findings of this study will be carried forward in a study of larger dimension in near future. This paper aims to outline the study and its findings towards estimation of Life Cycle Costing process for Naval equipment.

Keywords

Make in India Indian naval shipbuilding programme Indigenous submarine construction Indian naval indigenization plan Life Cycle Cost 

References

  1. 1.
    Arshad, T.K.: Ship’s Life Cycle Cost. Published in https://tkays.com/2013/01/31/ships-life-cycle-costing/ (2013)
  2. 2.
    Barrington, H.P.: A Life Cycle Cost Summary. Published in International Conference of Maintenance Societies (ICOMS—2003). (http://www.barringer1.com/pdf/LifeCycleCostSummary.pdf) (2003)
  3. 3.
    Behal, R.: Naval Shipbuilding Financials. Published in http://www.defproac.com/?p=2700 (2015)
  4. 4.
    DoI (Directorate of Indigenization) IHQ MoD (N): Indian Naval Indigenization Plan (INIP) 2015–2030, pp. 6.7.8 (2015)Google Scholar
  5. 5.
    Kanwal, G.: India’s Military Modernization: Plans and Strategic Underpinnings, p. 6. The National Bureau of Asian Research for the Senate India Caucus (2015)Google Scholar
  6. 6.
    Kennedy, G., Pant, H.V.: Indian Navy’s Maritime Security Strategy—An Assessment, pp. 1, 3, 4, 5. National Maritime Foundation (2016)Google Scholar
  7. 7.
    Langdon, D.: Literature Review of Life cycle Costing (LCC) and Life Cycle Assessment (LCA). (Published in http://www.tmb.org.tr/arastirma_yayinlar/LCC_Literature_Review_Report.pdf) (2006)
  8. 8.
    MoD (Ministry of Defence): Defence Procurement Procedure—2016 (2016)Google Scholar
  9. 9.
    Prabhakar, V.J., Sandborn, P.: A part total cost of ownership model for long life electronic systems. Int. J. Comput. Integr. Manuf. 25(4–5), 384–397 (2010)Google Scholar

Copyright information

© Springer Nature Singapore Pte Ltd. 2020

Authors and Affiliations

  1. 1.Symbiosis International (Deemed) UniversityLavle, PuneIndia
  2. 2.Symbiosis Institute of Management Studies (SIMS)Constituent of Symbiosis International (Deemed) UniversityPuneIndia

Personalised recommendations