Assessment on the performance of EPB-TBM in the construction of pilot metro line in Ho Chi Minh city (Vietnam)

  • Conference paper
  • First Online:
CIGOS 2019, Innovation for Sustainable Infrastructure

Part of the book series: Lecture Notes in Civil Engineering ((LNCE,volume 54))

  • 120 Accesses

Abstract

Line 1 (Ben-Thanh – Suoi-Tien) of the Ho Chi Minh city Urban Railway Project is the pilot metro in Vietnam, also the first transport tunnel constructed by the earth pressure balanced single shield tunnel boring machine (EPB-TBM), of which the outer diameter is 6.79 m. Two parallel 781-m-tunnels (West Bound and East Bound) have been constructed from May 2017. They mainly locate in loose sand layers with small SPT values and the small overburden heights: 8.7 to 9 m of the former and 8.7 to 22.3 m of the latter. EPB-TBM have proven the suitability for the metro line in such geological conditions and the narrow construction site in urban areas of Ho Chi Minh city. In this paper, for the assessment of EPB-TBM during the tunnel construction, some main operation parameters of the machine in each performance routine have been analysed and the influence of the geological conditions along the alignment to the machine journey was initially studied. The study’s goal is the better understanding of the EPB-TBM performance in the first TBM metro line in Vietnam, as an experience learning for the next ones which have been scheduled to be soon appeared in Ho Chi Minh city and Hanoi.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 189.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 249.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 329.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Similar content being viewed by others

References

  1. Shimizu-Maeda Joint Operation: Introduction video of Contract Package 1b: Civil (Underground Section from KM 0+615 to KM 2+360). Ho Chi Minh city (2016).

    Google Scholar 

  2. Working group for shield tunnels of JSCE: Standard specifications for tunnelling 2006: Shield tunnels. Japan Society of Civil Engineers, Tokyo (2007).

    Google Scholar 

  3. Shimizu-Maeda joint operation: Method statement for bored tunnel construction of Contract Package 1b - HCM City Urban Railway Construction Project. Ho Chi Minh City (2016).

    Google Scholar 

  4. Shimizu-Maeda Joint Operation: Report on Geology of Contract Package 1b - HCM City Urban Railway Construction Project. Ho Chi Minh city (2015)

    Google Scholar 

  5. Shimizu-Maeda Joint Operation: Geotechnical explanation report for bored tunnel of Contract Package 1b - HCM City Urban Railway Construction Project. Ho Chi Minh city (2015).

    Google Scholar 

  6. Ministry of Science and Technology of Vietnam: TCVN 3994-85: Anti-corrosion in concrete and reinforced concrete structure construction - Classification of erosion environment. Hanoi (1985). (In Vietnamese)

    Google Scholar 

  7. Shimizu-Maeda Joint Operation: Technical specifications of Contract Package 1b - HCM City Urban Railway Construction Project. Ho Chi Minh city (2015).

    Google Scholar 

  8. Moon, H.: A Comparative Study on Five Assessment Systems of TBM Tunnelling. Geosystem Engineering, 4(2), 61–69 (2012).

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Thu-Hang Tran .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2020 Springer Nature Singapore Pte Ltd.

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Tran, TH., Hoang, MT. (2020). Assessment on the performance of EPB-TBM in the construction of pilot metro line in Ho Chi Minh city (Vietnam). In: Ha-Minh, C., Dao, D., Benboudjema, F., Derrible, S., Huynh, D., Tang, A. (eds) CIGOS 2019, Innovation for Sustainable Infrastructure. Lecture Notes in Civil Engineering, vol 54. Springer, Singapore. https://doi.org/10.1007/978-981-15-0802-8_127

Download citation

  • DOI: https://doi.org/10.1007/978-981-15-0802-8_127

  • Published:

  • Publisher Name: Springer, Singapore

  • Print ISBN: 978-981-15-0801-1

  • Online ISBN: 978-981-15-0802-8

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics