Lithium-ion (Li-ion) cells are becoming increasingly attractive for use in grid-scale Battery Energy Storage Systems (BESSs). A key problem with BESSs is the potential for poor utilization of mismatched cells and reliability issues resulting from the use of large series strings of cells. This paper investigates the close integration of a cascaded H-bridge multi-level inverter and a large number of Li-ion cells interfacing with an AC electrical grid. The cells are organized in a hierarchical structure consisting of modules, sub-banks, banks and phases. The control strategy includes four levels of balancing: balancing of cells within a module, balancing of modules within a sub-bank, sub-banks within banks, and banks within phases. The system is validated in simulation for a 380 kWh BESS using 2835 Li-ion cells. Charge balancing is demonstrated for mismatched cells by varying the parameters such as ampere-hour capacity, internal resistance, and initial State-of-Charge. Bank division topology has been implemented to look for the required cells to achieve the reference voltage by keep dividing the cells into two banks. It reduces the simulation time by 73.5% and thus improves the operational efficiency of the balancing control while achieving cell balancing. This work is intended to address the challenges of eventual scaling towards a 100 MWh+ BESS, which may be composed upwards of 100k individual cells.

Keywords

Battery Hierarchical balancing control Bank division Energy storage 

Notes

Acknowledgements

This work is financially supported by Universiti Sains Malaysia (USM): 304/PELECT/60313053.

References

  1. 1.
    Fulton, L.: Climate change mitigation pathways for Southeast Asia: CO2 emissions reduction policies for the energy and transport sectors. Sustainability (Switzerland) 9(7) (2017).  https://doi.org/10.3390/su9071160
  2. 2.
    Green, O., Studies, G.: OECD green growth studies. Director 104 (2012).  https://doi.org/10.1787/9789264115118-en
  3. 3.
    Aghamohammadi, M.R., Abdolahinia, H.: A new approach for optimal sizing of battery energy storage system for primary frequency control of islanded Microgrid. Int. J. Electr. Power Energy Syst. (Elsevier Ltd.) 54, 325–333 (2014).  https://doi.org/10.1016/j.ijepes.2013.07.005CrossRefGoogle Scholar
  4. 4.
    Ooi, C.A., Rogers, D., Jenkins, N.: Balancing control for grid-scale battery energy storage system. In: Proceedings of the ICE—Energy, vol. 168, no. 2, pp. 145–157 (2015)Google Scholar
  5. 5.
    Ooi, C.A.: Balancing Control for Grid-scale Battery Energy Storage System, p. 265. Cardiff University (2016)Google Scholar

Copyright information

© Springer Nature Singapore Pte Ltd. 2019

Authors and Affiliations

  1. 1.School of Electrical and Electronic EngineeringUniversiti Sains Malaysia (USM)Nibong TebalMalaysia

Personalised recommendations