Advertisement

Study on Parking Mechanism Based on Parking Spaces Time Series

  • Xing-pei Wei
  • Yong-gang Wang
  • Yan-qiu Cheng
  • Gao-xiang Zhu
Conference paper
Part of the Lecture Notes in Electrical Engineering book series (LNEE, volume 503)

Abstract

In order to further improve the accuracy of the parking lot scale and solve the traffic organization problem of the large-scale integrated underground parking lot, this paper analyzes the shortcomings of the traditional parking demand forecasting model which lacks the description of the dynamic change mechanism of the parking process, resulting in the poor accuracy of the prediction result. The time-varying law of the cumulative product/attract of each parking lot is obtained through the data fitting, and the correction coefficient is introduced according to the comparison between the reference land and the project land—The time—varying law model of the project land is obtained, and the net time—varying curve is drawn by the image method to obtain the parking scale of the project land.

Keywords

Parking demand forecast Time series Parking spaces Resource sharing 

References

  1. 1.
    Zhou Z, Chen J, Wang W (2004) Urban parking facilities planning self-evaluation simplified decision-making method. J Traffic Transp Eng 4(4):53–57Google Scholar
  2. 2.
    Qi J, Guo S, Zhang Y (2012) The solution of traffic in commercial center—taking Guanyinqiao business circle as an Example. J Chongqing Jiao tong Univ (Nat Sci), 31(s1):52–54, 184Google Scholar
  3. 3.
    Guan H, Wang X, Wang X (2006) Research on forecasting method of parking demand. J Beijing Univ Technol 32(7):600–604Google Scholar
  4. 4.
    Cheng F, Yan K, Wen Y (2006) Study on the supply of parking facilities in urban central area. Highw Eng 31(5):99–103Google Scholar
  5. 5.
    Wang F, Zhou X, Yan Y (2007) Parking demand forecasting model based on land use and traffic characteristics. J Traffic Transp Eng 7(2):84–88Google Scholar
  6. 6.
    Wang W, Chen H, Wei L (2016) Research on forecasting model of traffic accident time series. China Saf Sci J 26(6):52–56Google Scholar
  7. 7.
    Li L, Wang M, Dong Z (2010) Parking method based on berth function and location condition. China J Highw Transp 23(1):111–115Google Scholar

Copyright information

© Springer Nature Singapore Pte Ltd. 2019

Authors and Affiliations

  • Xing-pei Wei
    • 1
  • Yong-gang Wang
    • 2
  • Yan-qiu Cheng
    • 1
  • Gao-xiang Zhu
    • 2
  1. 1.Transportation Planning and Management, Highway CollegeChang’an UniversityXi’anChina
  2. 2.Transportation Engineering, Highway CollegeChang’an UniversityXi’anChina

Personalised recommendations