Phasis of Sanitation of Waste Dumps at the Example of Sanitary Landfill Bielefeld — Senne

  • J. Peters
  • A. Wiebe

Summary

Between first groundwater contamination and technical reaktion there is often “wasted time”. At the example of the sanitary landfill Bielefeld – Senne the needs of time and money for hydraulic and technical sanitation is shown. The phases of running the landfill incl. recognizing mistakes, investigation and planning incl. “first aid” and sanitation itself are to be run through. For these in Bielefeld 3 – 7, 34 and at minimum 3 years have been necessary.

Keywords

Groundwater Contamination Sanitary Landfill Groundwater Area Narrow Flow Longterm Demand 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Literature

  1. /1/.
    Slomka u. Harder: AbschluBbericht z. Deponie Senne, Gutachten i. A. Stadt Bielefeld, 8/88, unveröffentlichtGoogle Scholar
  2. /2/.
    Knipschild: Prüfbericht PE-Foliendichtung, 1/90, Gutachten i. A. Stadt Bielefeld, unveröffentlichtGoogle Scholar
  3. /3/.
    Kühn: Erdbautechnische Untersuchungen im Schachtbereich Deponie Senne 1/90, i. A. Bielefeld, unveröffentlichtGoogle Scholar
  4. /4/.
    Materialprüfanstalt Hannover: Prüfbericht über PVC - Sickerwassersammelrohre 1/90, i. A. Bielefeld, “Google Scholar

Copyright information

© Springer Science+Business Media Dordrecht 1990

Authors and Affiliations

  • J. Peters
  • A. Wiebe

There are no affiliations available

Personalised recommendations