Status of the National Implementation of the NC RfG in Germany

  • Fynn Scheben
  • Kay Genzmer
  • Jan-Martin Mohrdieck
  • Jochen Möller
Conference paper

Abstract

Grid integration of decentral power generation units and storage systems as well as new requirements from the „Network Code on Requirements for Grid Connection of Generators“ (NC RfG) by the European Unionlead to new grid codes in all countries of the EU. In Germany the VDE „Association for Electrical, Electronic & Information Technologies“ will publish new grid requirements for power generating facilities and storage systems in the next two years. The grid codes for all valtage levels from low valtage to ultrahigh valtage are being revised at the moment. It is expected that the first public draft of the medium valtage level grid code (VDE-AR-N 4110) will be available in autumn 2016. This medium valtage grid code uses concepts ofthe latest public high valtage grid code VDE-AR-N 4120 which will be amended itself according to the requirements from the NC RfG. In a further step the test and certification requirements will be updated in Germany by the FGW. This paper provides an overview on the current status of the grid code requirements and the test, simulation and certification guidelines in Germany.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Copyright information

© Springer Fachmedien Wiesbaden GmbH 2017

Authors and Affiliations

  • Fynn Scheben
    • 1
  • Kay Genzmer
    • 1
  • Jan-Martin Mohrdieck
    • 1
  • Jochen Möller
    • 1
  1. 1.Moeller Operating Engineering GmbHItzehoe/Kiel/HamburgDeutschland