The Scheduling of a Multi-Product Facility
Abstract
We are concerned with obtaining the optimal schedule of N products over a single facility in the finite and infinite horizons. This is a generalization of the classical cyclical “Economic Manufacturing Quantity” formulations. Through number-theoretic arguments we discuss questions of feasibility, the existence of communicating classes, and sensitivity to “saturation”. In the finite horizon case, we present an algorithm that generates the production plan, and another algorithm that generates the production schedule through a shortest-path interpretation. In the infinite horizon case, we do likewise: the optimal production plan is a Turnpike cycle. Due to the immensity of the state space, approximate procedures are also discussed.
Keywords
Planning Horizon Production Plan Optimal Schedule Feasible Schedule Infinite HorizonPreview
Unable to display preview. Download preview PDF.
References
- 1.Blackwell, D., “Discrete Dynamic Programming”, Ann Math. Stat., 33, (1962), 719–726.CrossRefGoogle Scholar
- 2.Bomberger, E. E., “A Dynamic Programming Approach to a Lot Size Scheduling Problem”, Mgt. Sc., Vol. 12, No. 11, July 1966.Google Scholar
- 3.Brown, Robert G., Management Decisions for Production Operations, Dryden Press, Inc., Hinsdale, Ill. (1971).Google Scholar
- 4.Dantzig, G. B., W. O. Blattner, and M. R. Rao., “Finding a Cycle in a Graph with Minimum Cost to Time Ratio with Application to a Ship Routing Problem”, Operations Research House, Stanford Univ., Technical Report No. 66–1.Google Scholar
- 5.de Ghellink, G. T., “Les Problemes de Decisions Sequentielles”, Cahiers Centre d’Etudes Rech. Operationnelle, 2, (1960), 161–179.Google Scholar
- 6.Derman, G., “On Sequential Decisions and Markov Chains”, Mgt. Sc., 9, 1 (Oct. 1962), 16–24.CrossRefGoogle Scholar
- 7.Doll, C. Loren, “An Integer-Constrained EOQ-Based Single Machine Scheduling Heuristic”, Paper No. 337, Oct. 1971, The Inst, for Res. in the Behavioral, Economic and Mgt. Sciences, Purdue Univ., Lafayette, Ind.Google Scholar
- 8.Dooley, J. E. and Ben Bernholtz, “A Many Product Single-Machine Recursive Scheduling Procedure”, Can. Oper. Res. Soc. Jour., 7, 3, (1969), 165–176.Google Scholar
- 9.Eilon, S., “Economic Batch Size Determination of Multi-Product Scheduling”, Operational Research Quarterly, (England), Vol. 9, No. 4, Dec. 1958.Google Scholar
- 10.Elmaghraby, S. E., “The Machine Sequencing Problem: Review and Extensions”, Nav. Res. Log. Quart., Vol. 15, No. 2, June 1968.Google Scholar
- 11.Elmaghraby, S. E. and A. Mallik, “The Scheduling of a Multi-Product Facility”, O.R. Report No. 76, N. C.State Univ., April 10, 1972.Google Scholar
- 12.Elmaghraby, S. E., A. Mallik and H.L.W. Nuttle, “The Sequencing of Lots on a Single Facility”, Ind. Eng. Transactions, Vol. 2, No. 3, Sept., 1970.Google Scholar
- 13.Elmaghraby, S. E., “A Graph Theoretic Interpretation of the Sufficiency Conditions for the Contiguous-Binary-Switching (CBS) Rule, Nav. Res. Log. Quart., 18, 3, 339–364 (Sept. 1971).CrossRefGoogle Scholar
- 14.Glassey, C. R., “An Algorithm for a Machine Loading Problem”, Jour, of I.E., Oct. 1967, Vol. XVIII, No. 10.Google Scholar
- 15.Haessler, R. W., “A Note on Scheduling a Multi-Product Single Machine System for an Infinite Planning Period”, Letter to Ed., Mgt. Sc, 18, 4, (Dec. 1971), B240–B241).Google Scholar
- 16.Hanssmann, Fred, “Operations Research in Production and Inventory”, John Wiley, 1962, pp. 158–160.Google Scholar
- 17.Harris, Ford, Operations and Cost (Factory Management Services), A. W. Shaw Co., Chicago, (1915), pp. 48–52.Google Scholar
- 18.Krone, L. W., “A Note on Economic Lot Sizes for Multi-Purpose Equipment”, Mgt. Sc., 10, 3, 461–464 (Apr. 1964).CrossRefGoogle Scholar
- 19.Madigan, J. G., “Scheduling a Multi-Product Single Machine System for an Infinite Planning Period”, Mgt. Sc., 14, 11, (July 1968), 713–719.CrossRefGoogle Scholar
- 20.Mallik, A., “The Scheduling of a Single Processor Under Deterministic Demand for Several Products”, Unpublished Ph.D. Dissertation, N. C. State Univ., Raleigh, N. C., August, 1972.Google Scholar
- 21.Manne, A. S., “Linear Programming and Sequential Decisions”, Mgt. Sc., 6, 3 (Apr. 1960), 259–267.CrossRefGoogle Scholar
- 22.Maxwell, William L., “The Scheduling of Economic Lot Sizes”, Nav. Res. Log. Quart., Vol. 11, Nos. 2 & 3, June-Sept. 1964.Google Scholar
- 23.Raymond, F. E., Quantity and Economy in Manufacture, McGraw-Hill, 1931.Google Scholar
- 24.Rogers, J., “A Computational Approach to the Lot Scheduling Problem”, Mgt. Sc., Vol. 4, No. 3, April, 1958.Google Scholar
- 25.Salveson, M. E., “Mathematical Theory of Production”, Jour, of Ind. Eng., Vol. 4, No. 1, Feb. 1953.Google Scholar
- 26.Shapiro, J. F., “Shortest Route Methods for Finite State Space Deterministic C.P. Problems”, SIAM,Vol. 16, No. 6, Nov. 1968.Google Scholar
- 27.Vazsonyi, A., “Economic Lot Size Formulas in Manufacturing”,Oper. Res., 5, 1 (Feb. 1957, 28–44.CrossRefGoogle Scholar
- 28.Wagner, Harvey, Principles of Operations Research, Prentice-Hall, N. J., Chapter 12, (1969), pp. 425–430.Google Scholar