Social Science Research on CAD/CAM pp 175-183 | Cite as
Integrated CAD/CAM-Systems and Organizational Latitudes on the Shop Floor — Initial Findings and Hypotheses
Abstract
Integrated CAD/CAM-systems are employed to achieve computer-aided integration in all production functions, from design and planning up to manufacturing and the assurance of quality standards. So far, however, overall integration of this kind has hardly been put into practice. This applies particularly to the medium and small batch production of the machine-building industry *). At present various concepts of CAD/CAM integration which complement or overlap each other, often to the extent of operating concurrently in the case of implementation, can be discerned. On the one hand, concepts are concerned with the integration of design functions with planning, controlling and programming functions (CAD/CAP). On the other hand, they are concerned with the integration of manufacturing functions with planning, controlling and programming functions (DNC). Overall computer-aided integration, from design through to manufacturing, has only been conceived for a small number of product elements and limited manufacturing processes so far.
Preview
Unable to display preview. Download preview PDF.
References
- Beitz, W.: Entwicklungszwänge für den Konstruktionsprozeß, in: ZwF, Vorträge des Produktionstechnischen Kolloquiums Berlin, Sonderdruck 1983.Google Scholar
- Bergmann, J.; Hirsch-Kreinsen, H.: Arbeitsorganisation an CNC-Maschinen. Wirksamkeit von Positionen und Interessen im Umstellungsprozeß, in: Werkstatt und Betrieb, 118 (1985) B.Google Scholar
- Brandt, G. et al.: Computer und Arbeitsprozeß, Frankfurt/New York 1978.Google Scholar
- Döpper, W.; Ilzig, F.: Einsatzverfahren mit CAD/CAM-Systemen in der spanenden Fertigung, in: Kolloquium: Automatische Produktionssysteme, hectograph. paper, TU-München 1985.Google Scholar
- Eigner, M.; Maier, H.: Einstieg in CAD, München/Wien 1985.Google Scholar
- Förster, H.-U.: CAD/PPS-Kopplung - ein Meilenstein auf dem Weg zur rechnerintegrierten Fertigung, in: CAD/CAM Report, 1,2/1985.Google Scholar
- Gangl, P.: Praktische Gesichtspunkte beim Einsatz eines CAD/CAM-Systems im Werkzeugbau, paper, Darmstadt n.d.Google Scholar
- Hammer, H.; Herholz, B.: NC-Programmierung und DNC-Betrieb, in: tz für Metallbearbeitung, 77 (1983) 3. - 183 -Hellwig, U. et al.: Die Kopplung von CAD und CAM, in: VDI-Z, 10,11/1983.Google Scholar
- Knetsch, W.; Baaken, Th.: Veränderungen beruflicher Qualifikation durch neue Technologien am Beispiel CAD/CAM hectograph. paper, VDI-Technologiezentrum, Berlin 1983.Google Scholar
- Lay, G. et al.: Wirtschaftliche und soziale Auswirkungen des Einsatzes von integrierten CAD/CAM-Systemen. Untersuchungsteil I: Technische Entwicklung, Diffusion und betrieblicher Einsatz, RKW-Projekt A 148/83, hectograph. paper, Eschborn 1984.Google Scholar
- Lay, G.; Maisch, K.: Vernetzte Programm-Module, in: NC-Fertigung, 2/1984.Google Scholar
- Leibinger, B.: Zukunftsperspektiven für die Klein-und Mittelserienfertigung, in: ZwF, Vorträge des Produktionstechnischen Kolloquiums, Berlin, Sonderdruck 1983.Google Scholar
- Maier, H.: CIM-Expertise, unpublished paper, Leopoldshafen, Oktober 1985.Google Scholar
- NC-Praxis: NC-Praxis, Landsberg, Mai 1985, Sept. 1985.Google Scholar
- Projektträger Fertigungstechnik (ed.): Autonome Fertigungsinsel. Flexible Fertigungsstrukturen für die Einzel-und Kleinserienfertigung, KM-PET 79, Karlsruhe 1984.Google Scholar
- Roland Berger and Partner GmbH:Google Scholar
- NC-Technik. Stand und Entwicklungstendenzen, hectograph. paper, München, Oktober 1984.Google Scholar
- Spur, G.: Uber intelligente Maschinen und die Zukunft der Fabrik, in: Forschungsmitteilungen der DFG 3/1984.Google Scholar
- Storr, A. et al.: Numerische Standardsteuerungen in verketteten Fertigungssystemen, in: wt - Z. ind. Fert., 75 (1985) 6.Google Scholar
- Wildemann, H. et al.: Strategische Investitionsplanung für CAD/CAM, hectograph. paper, Universität Passau 1985.Google Scholar
- Wingert, B. et al.: CAD im Maschinenbau. Chancen, Wirkungen, Risiken, Berlin etc. 1984.Google Scholar
- von Zeppelin, W.: Rechnergestützte NC-Programmierung und Betriebsorganisation, in ZwF 80 (1985) 8.Google Scholar