Identification of Major Duration Delay Risks in Infrastructure Projects: Viewpoints from Different Stakeholders

Conference paper

Abstract

Effective risk management is regarded as a key factor to ensure the successful implementation of infrastructure projects. However, previous literature shows that how various stakeholders perceive duration risks in infrastructure projects in China is lacking. Thus, this study aims to identify major duration risks in infrastructure projects and make a comparison of various stakeholders’ views toward these risks. With the aid of literature review and questionnaire survey, 15 major duration risks are identified and analyzed. The results demonstrates that contractors shall take main initiative in managing duration risks. Further, there is a consensus among different stakeholders that major duration risks include “F04 Construction change by clients”, “F05 Late monthly payment”, “F15 Unreasonable schedule plan”, and “F12 Design changes”. These findings would be useful for deepening the understanding of duration risks in Chinese infrastructure projects.

Keywords

Duration delay Risk management Infrastructure project Project stakeholder 

Notes

Acknowledgments

This study was supported by the National Natural Science Foundation of China (71272088).

References

  1. 1.
    Akintoye A, Macleod JM (1997) Risk analysis and management in construction. Int J Proj Manag 15:31–38CrossRefGoogle Scholar
  2. 2.
    Wang JY, Yuan HP (2011) Factors affecting contractors’ risk attitudes in construction projects: case study from China. Int J Proj Manag 29(2):209–219CrossRefGoogle Scholar
  3. 3.
    Zou PXW, Zhang GM, Wang JY (2007) Understanding the key risks in construction projects in China. Int J Proj Manag 25:601–614CrossRefGoogle Scholar
  4. 4.
    Shen LY (1997) Project risk management in Hong Kong. Int J Proj Manag 15(2):101–105CrossRefGoogle Scholar
  5. 5.
    Kangari R (1995) Risk management perception and trends of U.S. construction. J Constr Eng Manag 121:422–429CrossRefGoogle Scholar
  6. 6.
    Lyons T, Skitmore M (2004) Project risk management in the Queensland engineering construction industry: a survey. Int J Proj Manag 22:51–61CrossRefGoogle Scholar
  7. 7.
    Skorupka D (2008) Identification and initial risk assessment of construction projects in Poland. J Manag Eng 24(3):120–127CrossRefGoogle Scholar
  8. 8.
    Sun Y, Fang DP, Wang SQ, Dai M, Lv XQ (2008) Safety risk identification and assessment for Beijing Olympic venues construction. J Constr Eng Manag 24(1):40–48CrossRefGoogle Scholar
  9. 9.
    Wang SQ, Dulaimi MF, Aguria MY (2004) Risk management framework for construction projects in developing countries. J Constr Eng Manag 22:237–252CrossRefGoogle Scholar
  10. 10.
    Yuan JF, Deng XP, Li QM (2008) The relationship of critical risk factors in chinese PPP projects: modeling perspective. In: International conference on information management, innovation management and industrial engineering. Nanjing, pp 151–154Google Scholar

Copyright information

© Springer-Verlag Berlin Heidelberg 2014

Authors and Affiliations

  1. 1.College of Civil EngineeringShenzhen UniversityShenzhenChina
  2. 2.School of Economics and ManagementSouthwest Jiaotong UniversitySichuanChina

Personalised recommendations