An AI Based Online Scheduling Controller for Highly Automated Production Systems

  • Emanuele Carpanzano
  • Amedeo Cesta
  • Fernando Marinò
  • Andrea Orlandini
  • Riccardo Rasconi
  • Anna Valente
Conference paper
Part of the Lecture Notes in Production Engineering book series (LNPE)

Abstract

Highly automated production systems are conceived to efficiently handle evolving production requirements. This concerns any level of the system from the configuration and control to the management of production. The proposed work deals with the production scheduling level. The authors present an AI-based online scheduling controller for Reconfigurable Manufacturing Systems (RMSs) whose main advantage is its capacity of dynamically interpreting and adapting any production anomaly or system misbehavior by regenerating on-line a new schedule. The performance of the controller has been assessed by running a set of closed-loop experiments based on a real-world industrial case study. Results demonstrate that the capability of automatically synthesizing plans together with recovery actions severely contribute to ensure a high and continuous production rate.

References

  1. 1.
    Smith, T., Waterman, M.: Identification of common molecular subsequences. J. Mol. Biol. 147, 195–197 (1981)CrossRefGoogle Scholar
  2. 2.
    Wiendahl, H.P., ElMaraghy, H., Nyhuis, P., Zah, M., Wiendahl, H.H., Duffie, N., Brieke, M.: Changeable manufacturing - classification, design and operation. CIRP Ann. - Manufact. Technol. 56(2), 783–809 (2007)CrossRefGoogle Scholar
  3. 3.
    Terkaj, W., Tolio, T., Valente, A.: Designing Manufacturing Flexibility in Dynamic Production Contexts. Des. Flex. Prod. Syst. Methodol. Tools 1–18 (2009)Google Scholar
  4. 4.
    Koren, Y., Heisel, U., Jovane, F., Moriwaki, T., Pritschow, G., Ulsoy, G., Van Brussel, H.: Reconfigurable manufacturing systems. CIRP Ann. Manufact. Technol. 48(2), 527–540 (1999)Google Scholar
  5. 5.
    Landers, R., Min, B.K., Koren, Y.: Reconfigurable machine tools. CIRP Ann. Manufact. Technol. 50(1), 269–274 (2001)CrossRefGoogle Scholar
  6. 6.
    Terkaj, W., Tolio, T., Valente, A.: Design of focused flexibility manufacturing systems (FFMSs). Des. Flex. Prod. Syst. Methodol. Tools 137–190 (2009)Google Scholar
  7. 7.
    Terkaj, W., Tolio, T., Valente, A.: A stochastic programming approach to support the machine tool builder in designing focused flexibility manufacturing systems - FFMSs. Int. J. Manufact. Res. 5(2), 199–229 (2010)CrossRefGoogle Scholar
  8. 8.
    Stecke, K.: Design, planning, scheduling and control problem of flexible manufacturing systems. Ann. Oper. Res. 3, 1–13 (1985)CrossRefGoogle Scholar
  9. 9.
    Park, T., Lee, H., Lee, H.: FMS design model with multiple objectives using compromised programming. Int. J. Prod. Res. 39, 3513–3528 (2001)CrossRefGoogle Scholar
  10. 10.
    Shin, H., Park, J., Lee, C., Park, J.: A decision support model for the initial design of FMS. Comput. Ind. Eng. 33, 549–552 (1997)CrossRefGoogle Scholar
  11. 11.
    Valente, A., Carpanzano, E.: Development of multi-level adaptive control and scheduling solutions for shop-floor automation in reconfigurable manufacturing systems. CIRP Ann. Manufact. Technol. 60(1), 449–452 (2011)CrossRefGoogle Scholar
  12. 12.
    Carpanzano, E., Cesta, A., Orlandini, A., Rasconi, R., Valente, A.: Closed-loop production and automation scheduling in RMSs. In: ETFA. International Conference on Emergent Technologies and Factory Automation (2011)Google Scholar
  13. 13.
    Tolio, T., Urgo, M.: A rolling horizon approach to plan outsourcing in manufacturing-to-order environments affected by uncertainty. CIRP Ann. Manufact. Technol. 56(1), 487–490 (2007)CrossRefGoogle Scholar
  14. 14.
    Rasconi, R., Policella, N., Cesta, A.: Fix the schedule or solve again? Comparing constraint-based approaches to schedule execution. In: COPLAS-06. Proceedings of the ICAPS Workshop on Constraint Satisfaction Techniques for Planning and Scheduling Problems (2006)Google Scholar
  15. 15.
    Cesta, A., Oddi, A., Smith, S.: A constraint-based method for project scheduling with time windows. J. Heuristics 8(1), 109–136 (2002)MATHCrossRefGoogle Scholar
  16. 16.
    Valente, A., Carpanzano, E., Brusaferri, M.: Design and implementation of distributed and adaptive control solutions for reconfigurable manufacturing systems. In: CIRP Sponsored ICMS. International Conference on Manufacturing Systems (2011)Google Scholar

Copyright information

© Springer-Verlag Berlin Heidelberg 2013

Authors and Affiliations

  • Emanuele Carpanzano
    • 1
  • Amedeo Cesta
    • 2
  • Fernando Marinò
    • 2
  • Andrea Orlandini
    • 1
  • Riccardo Rasconi
    • 2
  • Anna Valente
    • 1
  1. 1.MilanoItaly
  2. 2.CNR-National Research Council of ItalyISTCRomaItaly

Personalised recommendations