The Best Laid Plans of Mice and Men

Part of the Springer Tracts on Transportation and Traffic book series (STTT, volume 1)

Abstract

As magnificent as New York’s transit system is, its history is full of plans and designs that, for better or worse, have never been implemented. Many of these have been noted in previous chapters. In this chapter, some of the more important, but unimplemented, projects are reviewed, together with some thoughts on how the city might have changed if they had been built. As New York looks towards the future, it is also appropriate to speculate on what role existing and perhaps expanded transit will play.

Keywords

Tunnel Boring Machine Transit System Rail Transit Subway System Trunk Line 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. 1.
    Ronan, T.: Subway Shelters to Cost $104,000,000 Proposed for City, December 29. New York Times, New York (1950)Google Scholar
  2. 2.
    Ferming, J.: 2nd Avenue Subway won’t lose fed funding, November 8. New York Post, New York (2011)Google Scholar
  3. 3.
    Pentchoukov, I.: East Side Access Project Receives $246 Million, September 21. The Epoch Times, New York (2011) (available on-line)Google Scholar
  4. 4.
    Feinman, M.: History of the Independent Subway, online manuscript, http://www.nycsubway.org
  5. 5.
    Sargent, G.: The Line That Time Forgot, http://www.nymag.com/nymetro/news/features/n_10109/
  6. 6.
    MTA Signs Second Avenue Subway Contract. The New York Sun (March 14, 2007) Google Scholar

Copyright information

© Springer-Verlag Berlin Heidelberg 2013

Authors and Affiliations

  1. 1.Transportation EngineeringPolytechnic Institute of New York UniversityNew YorkUSA
  2. 2.MTA New York City TransitPolytechnic Institute of New York University New YorkUSA

Personalised recommendations