Wind Turbines pp 719-787 | Cite as

Wind Turbine Installation and Operation

Abstract

Implementing turnkey projects for the utilisation of wind energy means much more than purchasing a wind turbine. Generating electrical energy from wind energy represents an intervention into the existing power supply infrastructure and even more so into the immediately surrounding environment. It is thus inevitable that it will encounter resistance from those who do not consider this intervention to be necessary or do not want it for some other reasons. The planning of wind energy projects falls right into this area of tension and is thus less of a technical problem than one of striving, as a rule over long periods, to achieve a balance between the various interests until an equitable consensus is found.

Keywords

Wind Turbine Wind Farm Rotor Blade Tooth Profile Wind Park 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

References

  1. 1.
    Lissamann, P.B.S., Zalay, A., Gyatt, G.W.: Critical Issues in the Design and Assessment of Wind Turbine Arrays. In: 4th International Symposium on Wind Energy Systems, Stockholm, September 21-22 (1982)Google Scholar
  2. 2.
    Kühn, M.: Dynamics and Design Optimisation of Offshore Wind Energy Conversion Systems. Report 200.002, Delft University Wind Energy Research Institute (2001)Google Scholar
  3. 3.
    Siemens: Offshore-Windenergiesysteme. Final Report BMFT No. 0329645 (1995)Google Scholar
  4. 4.
    Gasch,G.: GH SCADA, Allgemeines Überwachungs- und Datenerfassungssystem für Windparks, Firmenbroschüre, Oldenburg (2005)Google Scholar
  5. 5.
    Hassan, G.: GH SCADA, Allgemeines Überwachungs- und Datenerfassungssystem für Windparks, Firmenbroschüre, Oldenburg (2005)Google Scholar
  6. 6.
    Becker, E.: Gear-Controller zur Betriebsüberwachung von Windkraftgetrieben. Windkraft Journal (April 2001)Google Scholar
  7. 7.
    N.N.: Wind Energy Safety Access and Rescue Training, LTS Lakeshore Technical College, Cleveland, USA (2012)Google Scholar
  8. 8.
    Lloyd, G.: Vorschriften und Richtlinien, IV - Nichtmaritime Technik, Teil I - Windenergie, Richtlinie für die Zertifizierung von Windkraftanlagen (1993)Google Scholar
  9. 9.
    Seifert, H., Richert, E.: Aerodynamics of Iced Airfoils and their Influence on Loads and Power Production. In: European Wind Energy Conference Dublin, Ireland (October 1997)Google Scholar
  10. 10.
    Bauer, E.: Windenergieanlagen-Schadensbetrachtungen. Allianz Zentrum für Technik GmbH, Allianz Report 2/2001 (2001)Google Scholar
  11. 11.
    ISET: Windenergie Report Deutschland (1999/2000), Jahresauswertung des WMEP, Institut für Solare Energieversorgungstechnik (ISET), Kassel (2000)Google Scholar
  12. 12.
    DEWI: Studie zur aktuellen Kostensituation der Windenergienutzung in Deutschland, Deutsches Windenergie Institut, Wilhelmshaven (1999)Google Scholar
  13. 13.
    Enerco: Einspeisevergütung für Strom aus Windkraftanlagen. Enerco GmbH Gesellschaft für Energiewirtschaft und Umwelttechnik, Aldenhofen (1999)Google Scholar

Copyright information

© Springer-Verlag Berlin Heidelberg 2013

Authors and Affiliations

  1. 1.Dipl. Ing. MunichGermany

Personalised recommendations