Downhole and Surface Equipment

  • Davorin Matanović
  • Marin Čikeš
  • Bojan Moslavac
Chapter
Part of the Springer Environmental Science and Engineering book series (SPRINGERENVIRON)

Abstract

Completion as such is meant to be a link between drilling the borehole and the production phase. Without completing the well, hydrocarbons are not able to flow up hole under control. As a phrase, completion involves all the wellbore tools, accessories or tool assemblies involved in any wellbore operation. On the other hand, without proper surface equipment, which is one of the key factors for successful sand control operation execution, it is not possible to treat the fluid on the surface and pump it downhole.

This chapter is concentrated on sand control tools designed to prolong well life by eliminating sand production mechanically trapping it behind various downhole devices. All open or cased hole completions comprise of many different tools, accessories and devices like screens, packers, seal assemblies, running tools, blank pipes, safety joints, and other. They are introduced as an overview of possible tool combinations in certain occasions. Surface equipment consisting of mixers, pumps, blenders, filtering units and devices designed for treatment execution monitoring is presented as well.

Keywords

Diatomaceous Earth Filter Cake Open Hole Horse Power Nitrile Rubber 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Notes

Nomenclature

bhp

Brake horse power, W

e

Pump efficiency

hhp

Hydraulic horse power, W

hp

Horse power, W

p

Pumping pressure, Pa

References

  1. Ali S, Norman D, Wagner D, Ayoub J, Desroches J, Morales H, Price P, Shepherd D, Toffanin E, Troncoso J, White S (2002) Combined stimulation and sand control. Oilfield Rev Summer 14:30–47Google Scholar
  2. Allen TO, Roberts AP (1989) Production operations: well completions, workover and stimulation, 3rd edn. Oil & Gas Consultants International, TulsaGoogle Scholar
  3. Baker Oil Tools (1985) Baker sand control catalogue: Perforating, gravel packing and stimulation. Baker Oil Tools CompanyGoogle Scholar
  4. Baker Oil Tools (2002) Sand control systems. Baker Hughes, HoustonGoogle Scholar
  5. Bellarby J (2009) Well completion design, vol 56, Developments in petroleum science. Elsevier, HungaryGoogle Scholar
  6. Bradley HB, Gipsin FW, Odeh AS, Sizer PS, Mortada M, Raymer LL, Smith GL (1992) Petroleum engineering handbook. Society of Petroleum Engineers, RichardsonGoogle Scholar
  7. DeBruijn G, Skeates C, Greenaway R, Harrison D, Parris M, James S, Mueller F, Ray S, Riding M, Temple L, Wutherich K (2008) High-pressure, high-temperature technologies. Oilfield Rev Autumn 2008, Vol. 20, No. 3Google Scholar
  8. Dusterhoft RG (1994) FracPac completion services-stimulation and sand-control techniques for high-permeability oil and gas wells. Halliburton Energy Services, HoustonGoogle Scholar
  9. Economides MJ, Hill AD, Ehlig-Economides C (1994) Petroleum production systems. Prentice-Hall TPR, Upper Saddle RiverGoogle Scholar
  10. Economides MJ, Watters LT, Dunn-Norman S (1997) Petroleum well construction. Wiley, DuncanGoogle Scholar
  11. Haaland A, Rundgren G, Johannessen Ø (2005) Completion technology on troll-innovation and simplicity. In: Offshore technology conference, paper OTC 17113, HoustonGoogle Scholar
  12. Kleverlaan M, Van Noort RH, Jones I (2005) Deployment of swelling elastomer packers in shell E&P. In: SPE/IADC drilling conference, paper SPE/IADC 92346, AmsterdamGoogle Scholar
  13. Lake LW, Clegg JD (2007) Petroleum engineering handbook: production operations engineering, vol IV. Society of Petroleum Engineers, RichardsonGoogle Scholar
  14. OTIS Engineering Corporation (1991) Sand Control: Equipment and Services. Products and services catalogue, Otis Engineering Corporation Printed, USAGoogle Scholar
  15. Ott WK, Woods JD (2003) Modern sandface completion practices handbook, 1st edn. Gulf Publishing, HoustonGoogle Scholar
  16. Perrin D (1999) Well completion and servicing. Institut Francais du Petrole, ParisGoogle Scholar
  17. Restarick Jr HL, Fowler Jr SH, Sedotal WP (1991) Through-tubing sand-control techniques reduce completion costs. In: 1991 SPE offshore Europe conference, paper SPE 23130, AberdeenGoogle Scholar
  18. RIPE (2011) Online brochure manual. http://www.rripe.com.au/downloads.html
  19. Schlumberger (1992) Sand control engineering manual, vol 1, Schlumberger Company Course NotesGoogle Scholar
  20. Schlumberger (2011) Online brochure manual. http://www.slb.com/services/completions/sand_control.aspx
  21. Sparklet Engineers (2011) Online brochure manual. http://www.sparkletengineers.com/cement_bulk_plant_equipments.html
  22. Suman GO Jr, Ellis RC, Snyder RE (1983) Sand control handbook, 2nd edn. Gulf Publishing, HoustonGoogle Scholar
  23. Yakeley S, Foster T, Laflin W (2007) Swellable packers for well fracturing and stimulation. In: Paper SPE 110621-MS, SPE annual technical conference and exhibition, Anaheim, 11–14 Nov 2007Google Scholar

Copyright information

© Springer-Verlag Berlin Heidelberg 2012

Authors and Affiliations

  • Davorin Matanović
    • 1
  • Marin Čikeš
    • 1
  • Bojan Moslavac
    • 1
  1. 1.Faculty of Mining, Geology and Petroleum Engineering Petroleum Engineering DepartmentUniversity of ZagrebZagrebCroatia

Personalised recommendations